
Library Operations
64
ESL E-Series Tape Library User’s Guide
Powering off the library
To power off the library:
1. Place the library off-line, see “
Placing the library on-line or off-line
The library robotics completes any current commands and then stops.
2. Verify that the OCP display indicates “Off-line” from the
Operations
screen.
3. Verify that the media picker is empty.
4. Verify that no backups are in process.
5. Turn off the power switch located on the front of the library (see
page 61).
6. Wait for the library to complete the shutdown process. (This usually takes 30
seconds, but may take up to two minutes.)
7. Open the back door of the library cabinet and flip the breaker switches to the
off position (left). The breaker switches are on the power distribution unit
located on the bottom left side of the library cabinet.
Note:
When powering off the library, ensure that the two breaker switches on the
power distribution unit are in the off (left) position.
Summary of Contents for StorageWorks ESL E-Series
Page 8: ...Contents 8 ESL E Series Tape Library User s Guide ...
Page 16: ...About this Guide 16 ESL E Series Tape Library User s Guide ...
Page 46: ...Library Overview 46 ESL E Series Tape Library User s Guide ...
Page 106: ...Maintenance and Troubleshooting 106 ESL E Series Tape Library User s Guide ...
Page 112: ...Library Characteristics 112 ESL E Series Tape Library User s Guide ...
Page 130: ...Regulatory Statements 130 ESL E Series Tape Library User s Guide BSMI statement ...
Page 131: ...Regulatory Statements 131 ESL E Series Tape Library User s Guide Japan statement VCCI ...
Page 178: ...Event Reporting 178 ESL E Series Tape Library User s Guide ...
Page 184: ...Glossary 184 ESL E Series Tape Library User s Guide ...