4 Storage con
fi
guration
After all of the nodes have been con
fi
gured, con
fi
gure the storage:
• Establishing communication between the VLS300 and the EVA
• Managing VLS300 capacity
• Installing capacity licenses
Establishing communication between the VLS300 and the EVA
Verifying array zoning
Verify that you have con
fi
gured the zoning between the EVA ports and all storage ports on all the nodes
of your VLS300. For example, storage ports 2 and 3 on each node should connect to different SAN
zones/fabrics; EVA controllers should also be connected to both zones/fabrics. If you have not done
so, refer to the
VLS solutions guide
to do so now.
Presenting the LUNs
1.
Gather the device WWPNs.
a.
From Command View VLS, select the
System
tab.
b.
From the Navigation Tree, select
Nodes
, then a speci
fi
c node, then
Fibre Channel
.
The status pane displays information about the FC ports including the world wide port names
(WWPNs) (
Figure 14
).
Figure 14 Fibre Channel details window
c.
Write down the WWPN for each storage port on the node. There is no need to write down the
WWPNs for the host ports.
d.
Repeat these steps for each node on the VLS300.
2.
Create a host entry for the VLS device using the WWPNs gathered in the previous step:
HP StorageWorks
37
Summary of Contents for StorageWorks 300
Page 18: ...18 Introduction ...
Page 50: ...50 Operation ...
Page 60: ...60 User interfaces ...
Page 86: ...86 Configuration ...
Page 98: ...98 Management ...
Page 118: ...1 18 CLI command set ...
Page 128: ...128 Component identification ...
Page 142: ...142 Component replacement ...
Page 150: ...150 Troubleshooting ...
Page 161: ...Latvian notice Lithuanian notice Polish notice HP StorageWorks 161 ...
Page 170: ...170 Specifications ...
Page 176: ...176 Glossary ...