Repair Information
196
Power-Off Procedure
Powering the director off and on (performing a power cycle) resets all logic cards
and executes POSTs. When performing a power cycle, wait approximately 30
seconds before switching power on.
Note:
When the director is powered off, the operation of attached Fibre Channel
devices is disrupted. Do not power off the director unless directed to do so by a
procedural step or the next level of support.
To power off the director:
1. Notify the customer the director will be powered off. Ensure the customer’s
system administrator quiesces Fibre Channel frame traffic through the
director and sets attached devices offline.
2. Set the director offline (“
3. At the bottom rear of the director, set the power switch (circuit breaker) to the
down position. The director powers off.
4. If servicing the director, disconnect power cords from the input power module
at the bottom rear of the director. This step is not required when performing a
power cycle.
Summary of Contents for StorageWorks 2/140 - Director Switch
Page 18: ...About this Guide 18 Director 2 140 Service Manual ...
Page 160: ...Diagnostics 160 Director 2 140 Service Manual ...
Page 262: ...FRU Removal and Replacement 262 Director 2 140 Service Manual ...
Page 270: ...Illustrated Parts Breakdown 270 Director 2 140 Service Manual ...
Page 318: ...Information and Error Messages 318 Error Messages ...
Page 388: ...Event Code Tables 388 Director 2 140 Service Manual ...