Diagnostics
147
7. Modify the incompatible zone name as directed by the customer:
a.
At the Zoning dialog box, click the Zone Library tab. The dialog box
returns to the Zone Library page, as shown in
b. Right-click the zone name to be changed from the Zones field. A pop-up
menu displays.
c.
Choose the Rename option from the menu. The selected zone name
remains highlighted in blue.
d. Enter the new zone name (specified by the customer).
e.
Click OK to activate the change and close the Zoning dialog box.
Did the zone name change solve the problem and did both directors join through
the ISL to form a fabric?
NO
YES
↓
The directors, associated ISL, and multi-switch fabric are operational.
Exit MAP.
Contact the next level of support. Exit MAP.
17
A director E_Port segmented because a build fabric protocol error was detected.
1. Disconnect the fiber optic jumper cable from the segmented E_Port.
2. Reconnect the cable to the same port.
Did disconnecting and reconnecting the cable solve the problem and did both
directors join through the ISL to form a fabric?
NO
YES
↓
The directors, associated ISL, and multi-switch fabric are operational.
Exit MAP.
18
Initial program load (IPL) the director (“
Summary of Contents for StorageWorks 2/140 - Director Switch
Page 18: ...About this Guide 18 Director 2 140 Service Manual ...
Page 160: ...Diagnostics 160 Director 2 140 Service Manual ...
Page 262: ...FRU Removal and Replacement 262 Director 2 140 Service Manual ...
Page 270: ...Illustrated Parts Breakdown 270 Director 2 140 Service Manual ...
Page 318: ...Information and Error Messages 318 Error Messages ...
Page 388: ...Event Code Tables 388 Director 2 140 Service Manual ...