
Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No.
: Pegasus600
DISASS’Y SOP
Station :
Operation Name : Ver. :
Date
:
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Take out LVDS cable
27(1/2)
2017/5/23
1.00
Glove Requirements: Half-finger gloves
1. Tear the handle, then pull out LVDS cable
horizontally from the connector of Panel (Fig.
1).
Goldfinger side of LVDS cable is downward.
Follow the direction of red arrow to press the
both side of connector, then pull out the
cable (Fig. 2).
Fig. 1
Fig. 2
Press position as red arrows
LVDS