
Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No.
: Pegasus600
DISASS’Y SOP
Station :
Operation Name : Ver. :
Date
:
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Take out FAN & disconnect LVDS cable
13(1/1)
2017/5/23
1.00
1. Disconnect FAN cable-1 & 2 and LVDS cable
from the connectors of M/B side (Fig. 2, 3).
Pull out FAN cable from the hook carefully.
2. Unscrew (
×
4) all joints to take out FAN
illustrated as Fig. 1.
Torsion: 4.0
±
0.5 kgf.cm
Take the screwdriver vertically to the screw
holes.
Glove Requirements: Half-finger gloves
Fig. 1
Electric Screwdriver (S-4000MS)
Fig. 2
Pull out
counterclockwise
from the hooks
Pull black PIN1
Pull white PIN2
Fig. 2