Hardware options installation 36
6.
Tighten the captive screws.
7.
Push the latch back in place.
8.
Return the assembly to an upright position.
Prepare the server for operation after storage expansion unit
installation
1.
If removed, install the Kensington security lock.
For more information, see the Kensington security lock documentation.
2.
Connect all peripheral cables to the server.
3.
The server-storage expansion assembly requires a higher wattage rating than the 120 W provided
by the power adapter that shipped with the server. Use the 180 W power adapter included in the
option kit instead:
a.
Connect the power adapter to the server.
b.
Connect the power cord to the adapter.
c.
Connect the power cord to the power source.
4.
Secure the power cord and rear panel cables based on the standard cable management practices.
5.
Do one of the following:
o
Power up a single-server system (on page
o
Power up a clustered system (on page
Summary of Contents for ProLiant EC200a
Page 13: ...Component identification 13 Fan location in the storage expansion unit ...
Page 43: ...Cabling 43 Fan cabling Ambient temperature sensor cabling ...
Page 65: ...Support and other resources 65 ...
Page 66: ...Support and other resources 66 ...