Hardware options installation 75
b.
Install a hot-plug power input module in power supply bay 2.
15.
If removed, install the secondary PCI riser cage.
16.
Install the access panel (on page
17.
Install the server into the rack.
18.
Connect the power cords to the power supplies.
19.
To prevent accidental power cord disconnection when sliding the server in and out of the rack,
secure the power cord in the strain relief strap attached to the power input module handle:
a.
Unwrap the strain relief strap from the power input module handle.
CAUTION:
Avoid tight bend radii to prevent damaging the internal wires of a power cord or a
server cable. Never bend power cords and server cables tight enough to cause a crease in the
sheathing.
b.
Bend the plug end of the power cord in the position shown in the following image.
c.
Secure the power cord with the strain relief strap.
20.
Connect the power cords to the AC power source.
Summary of Contents for ProLiant DL60 Gen9
Page 14: ...Component identification 14 Fan locations ...
Page 22: ...Operations 22 o Secondary PCI riser cage o PCI blank ...
Page 86: ...Cabling 86 FBWC module slot 1 cabling FBWC module slot 2 cabling ...
Page 87: ...Cabling 87 FBWC module slot 3 cabling Smart Storage battery cabling ...
Page 117: ...Support and other resources 117 ...
Page 118: ...Support and other resources 118 ...