Removal and replacement procedures 39
7.
Remove the non-hot-plug drive backplane.
To replace the component, reverse the removal procedure.
Four-bay LFF hot-plug drive backplane
To remove the component:
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend or remove ("
Remove the server from the rack
) the server from the rack.
4.
Remove the access panel ("
5.
Remove all hot-plug hard drives ("
6.
Disconnect all cables connected to the drive backplane.
7.
Remove the hot-plug drive backplane.
Summary of Contents for ProLiant DL60 Gen9
Page 5: ...Contents 5 Documentation feedback 111 Index 112 ...
Page 13: ...Customer self repair 13 ...
Page 14: ...Customer self repair 14 ...
Page 15: ...Customer self repair 15 ...
Page 23: ...Illustrated parts catalog 23 ...
Page 33: ...Removal and replacement procedures 33 o Secondary PCI riser cage o PCI blank ...
Page 95: ...Component identification 95 Fan locations ...
Page 110: ...Acronyms and abbreviations 110 UID unit identification USB universal serial bus ...