Hardware options installation 60
7.
Connect the power and data cable to the system board and the optical drive.
8.
Install the access panel (on page
9.
Install the server into the rack ("
Installing the server into the rack
" on page
10.
Connect each power cord to the server.
11.
Connect each power cord to the power source.
12.
Redundant hot-plug power supply option
CAUTION:
All power supplies installed in the server must have the same output power capacity.
Verify that all power supplies have the same part number and label color. The system becomes
unstable and may shut down when it detects mismatched power supplies.
Label color
Output
Blue
460W
Orange
750W
White
750W 48V DC
Green
1,200W
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless
all bays are populated with either a component or a blank.
To install the component:
1.
Access the product rear panel (on page
2.
Remove the blank.
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the power supply or
power supply blank to cool before touching it.
Summary of Contents for ProLiant DL388p
Page 44: ...Hardware options installation 44 14 Install the heatsink 15 Remove the two fan blanks ...
Page 83: ...Cabling 83 LFF hard drive cabling Optical drive cabling ...
Page 84: ...Cabling 84 FBWC cabling 8 or 16 drive SFF 8 drive LFF PCIe option ...
Page 120: ...Technical support 120 ...
Page 121: ...Technical support 121 ...