Hardware options installation 31
3.
Install the drive.
4.
Determine the status of the drive from the drive LED definitions ("
Hot-plug drive LED definitions
" on
NVMe SSD option
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server
blade or the enclosure unless all drive and device bays are populated with either a component
or a blank.
1.
Remove the drive blank.
2.
Press the Do Not Remove button to release the Release lever.
3.
Install the drive.
Summary of Contents for ProLiant BL460c Gen9
Page 82: ...Support and other resources 82 ...