![HP ProCurve Series 2600 Installation And Getting Started Manual Download Page 30](http://html.mh-extra.com/html/hp/procurve-series-2600/procurve-series-2600_installation-and-getting-started-manual_163183030.webp)
Installing the Switch
Installation Procedures
2. Check the LEDs on the switch as described below.
In
stal
lin
g the
Sw
it
ch
Self Test LED
Switch port LEDs
Power and
Fault LEDs
Switch 2650
When the switch is powered on, it performs its diagnostic self test. Self test
takes approximately 50 seconds to complete.
Switch 2650-PWR
LED
Clear
Spd mode:
flash = 100 Mbps,
on = 1000 Mbps
)
1
11
23
12
24
hp
swit
FDx
M
Status
Spd
2
2
4
6
8
12
14
16
18
20
22
24
1
3
5
7
9
11
13
15
17
19
21
23
13
14
Mode
Reset
off = 10 Mbps,
PoE-Ready 10/100Base-TX Ports (1 - 48
Power
Fault
procurve
ch
2650-PWR
J8165A
PoE
Act
Link|
Test
RPS
EPS
Fan
10
PoE
Test LED
LED Behavior
During the self test:
•
Initially, all the switch and port LEDs are on. Most of the LEDs go off
and then may come on again during phases of the self test.
•
For the duration of the self test, the Self Test LED stays on.
2-10
Summary of Contents for ProCurve Series 2600
Page 2: ......
Page 3: ...ProCurve Series 2600 Switches Installation and Getting Started Guide ...
Page 60: ... This page is intentionally unused ...
Page 82: ... This page is intentionally unused ...
Page 92: ... This page is intentionally unused ...
Page 108: ... This page is intentionally unused ...
Page 115: ......