Operation instruction
Fixture list(fixture specification)
Qty
Fixture list(fixture specification)
Qty
Steps
:
Document No. : Primrose disassembly SOP
Station
:
Operation name : Ver. : 0.10 editing date : 2020/2/27
Issuing department
:
Prepared
:
Zhou Guiling
IE
Note: in case of any abnormality, please inform the foreman of assistant immediately
3(1/1)
1. Use the disassembly bar to pry off the base
cover from the hinge cap and hook according
to the sequence shown in the figure, and then
place it in the material box
。
2. Order of disassembly: 1
→
2
→
3,
❖
The base cover magnet can not be attached
other screws.
Remove the base cover