Operation instruction
Fixture list(fixture specification)
Qty
Fixture list(fixture specification)
Qty
Steps
:
Document No. : Primrose disassembly SOP
Station
:
Operation name : Ver. : 0.10 editing date : 2020/2/27
Issuing department
:
Prepared
:
Zhou Guiling
IE
Note: in case of any abnormality, please inform the foreman of assistant immediately
20(1/1)
1. Slowly remove the cooling copper foil from the
position as shown in the figure1
❖
Take care not to damage 2
nd
camera and nearby
FFC during tearing FFC,etc.
2. Disassemble the 2
nd
camera screw*1
。
(figure2)
❖
Screw material No : 6052B0156301 (M2.0x2.0)
❖
Torque
:
1.5 ± 0.2 Kgf
.
cm
❖
The screw shall not slip when locking
3. Remove 2nd Camera/B & Camera Module
。
(figure3)
4. Remove the Camera Module FPC from the 2
nd
camera/B CNTR
。
(figure4)
❖
Open the CNTR piano cover before exiting the FPC
dismantling2nd Camera
With 2nd Camera SKU
2
1
3
4