Operation instruction
Fixture list(fixture specification)
Qty
Fixture list(fixture specification)
Qty
Steps
:
Document No. : Primrose disassembly SOP
Station
:
Operation name : Ver. : 0.10 editing date : 2020/2/27
Issuing department
:
Prepared
:
Zhou Guiling
IE
Note: in case of any abnormality, please inform the foreman of assistant immediately
17(1/1)
Disassemble M/B Screw
1
1. Disassemble the M/B screw*5 according to the
sequence shown in the figure1.
❖
Screws material NO : 6052A0053001
(M2.0x2.5)
❖
Torque
:
1.5 ± 0.2 Kgf
.
cm
❖
Do not slide the screw when disassembling
Cross electric screwdriver head
1
2
3
4
5