Operation instruction
Fixture list(fixture specification)
Qty
Fixture list(fixture specification)
Qty
Steps
:
Document No. : Primrose disassembly SOP
Station
:
Operation name : Ver. : 0.10 editing date : 2020/2/27
Issuing department
:
Prepared
:
Zhou Guiling
IE
Note: in case of any abnormality, please inform the foreman of assistant immediately
8(1/1)
1
1.Remove K/b menbrance from M/b CNTR
。
(figure1)
❖
Open the piano cover of CNTR and exit the line
。
❖
Do not pull K/B Membrane
❖
do not press the broken line of KB
membrane(figure2)
2.Disassemble K/b backlight FPC from M/b CNTR
。
(figure1)
❖
Open the piano cover of CNTR and exit the line
。
❖
Do not pull K/B Backlight FPC
Disassembling FFC/FPC(1)
BL
KB
2