Removing components from the
Removing components from the frame
frame
Before installing the frame into the rack, you must remove all of the pre-installed components from the front and rear of the frame.
Because a fully-populated frame can weigh up to 249.50 kg (550.00 lb), removing the components from the frame makes moving and
installing the frame easier.
With the frame still on the pallet, remove all components from the front and rear of the frame.
IMPORTANT:
IMPORTANT: To ensure the correct configuration when installing components, be sure to note the location of each
component before removing it from the frame.
For specific instructions concerning removing the components, see the HPE Synergy 12000 Frame Maintenance and Service Guide.
Removing components from the frame
69
Summary of Contents for HPE Synergy 12000 Frame
Page 7: ...Planning the installation Planning the installation 7 ...
Page 23: ...Component and LED identification Component and LED identification 23 ...
Page 25: ...Information pull tabs 25 ...
Page 29: ...Figure 5 Optional horizontal half shelf Device bay partitions 29 ...
Page 33: ...Appliance bay numbering Appliance bay numbering 33 ...
Page 67: ...Installation Installation 67 ...
Page 85: ...Installing a device bay shelf 85 ...
Page 98: ...Installing drives in the storage module 98 ...
Page 101: ...Installing interconnect modules 101 ...
Page 119: ...Installing the DC power grounding kit with bracket 119 ...
Page 122: ...Configuring HPE Synergy Configuring HPE Synergy 122 ...
Page 124: ...HPE Synergy Console connections HPE Synergy Console connections 124 ...
Page 149: ...Troubleshooting Troubleshooting 149 ...
Page 157: ...Shift Insert Paste selected text Keyboard shortcut Action HPE Synergy Console icons 157 ...
Page 175: ...Support and other resources Support and other resources 175 ...