Installing the HPE G3 KVM Console Switch 8
Installing the HPE G3 KVM Console Switch
Rack-mount safety instructions
The HPE G3 KVM Console Switch ships with rack-mounting brackets for easy integration into the rack.
Stabilize the rack in a permanent location before installing the equipment. Avoid uneven loading or
overloading of the rack cabinets.
When rack-mounting this product, consider the following factors:
•
Elevated operating ambient temperature—In a closed or multi-unit rack assembly, the operating
ambient temperature of the rack environment can be greater than room ambient temperature. Install
the equipment in an environment compatible with the operating temperature.
•
Reduced air flow—In the rack, the rate of air flow required for safe operation of the equipment must
not be compromised.
•
Circuit overloading—When connecting the equipment to the supply circuit, consider the effect that
overloading of the circuits might have on overcurrent protection and supply wiring. Consider the
equipment nameplate ratings when addressing this concern.
•
Reliable earthing—Maintain reliable earthing of rack-mounted equipment. Pay particular attention to
supply connections other than direct connections to the branch circuit, such as the use of power
strips.
•
Product orientation—The equipment should not be mounted with the rear panel facing downward.
Installation checklist
Before installation, refer to the following lists to be sure that all of the listed components were received.
Console switch kit contents
•
Console switch
•
Power cords
•
Rack mounting kit
•
CAT5 to DB9 serial cable adapter
•
Documentation kit
This kit might contain extra hardware for your convenience.
Required items not included
•
IAs ("
Installing the interface adapter
" on page
One IA with one of the following connections is required for each server or device.
o
USB connection
o
Serial connection
o
HPE BladeSystem connection
•
UTP CAT5 cable or higher
Summary of Contents for G3 KVM
Page 6: ...Contents 6 ...