The rack grounding lug can be moved to any position on the top or bottom of the rack.
Installing the ground bonding kit on side panels
Procedure
1. Connect a 36.83-cm (14.5-inch) and a 15.24-cm (6-inch) grounding strap with connectors together.
2. Insert a T-25 Torx screw through the end of the 36.83-cm (14.5-inch) grounding strap and secure the screw to the middle
system chassis rail.
3. Place the end of the 15.24-cm (6-inch) grounding strap over the grounding lug on the bottom side panel.
4. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the bottom side panel and tighten
the washer.
5. Repeat steps 1 through 4 for the other bottom side panel.
IMPORTANT: The location of the welding stud on your model may vary.
Installing the ground bonding kit to the top side panel
Procedure
1. Connect a 36.83-cm (14.5-inch) and a 15.24-cm (6-inch) grounding strap with connectors together.
2. Insert a T-25 Torx screw through the end of a 36.83-cm (14.5-inch) grounding strap, and then secure the screw to the
middle system chassis rail.
Ground Bonding kit
39
Summary of Contents for G2 Series
Page 16: ...Ballast kit 16 ...
Page 19: ...5 Re attach the front and rear doors Baying kits 19 ...
Page 26: ...Cable Management Combo kit 26 ...
Page 29: ...Rack Roof Mount Fan kit 29 ...
Page 42: ...Hook and Loop Cabling Strap Clip kit 42 ...
Page 43: ...Hook and Loop Cabling Strap Clip kit 43 ...
Page 45: ...4 Bundle rack cables as required 1 4 Turn Hook and Loop Cabling Strap kit 45 ...
Page 57: ...Server Utility Shelf kit 57 ...
Page 65: ...Side Panel kit 65 ...
Page 68: ...5 Tighten the bolts from steps 2 and 4 Stabilizer kit 68 ...