Hardware options installation 65
Connect the VGA/USB cable to the Front VGA/USB connector toward the rear of the system
board.
o
4 LFF optical drive connection
Connect the SATA optical cable to the SATA optical/storage drive connector.
8.
Install the access panel (on page
9.
Slide the server into the rack.
10.
Connect all power cords to the server, and then power up the server.
8SFF Universal Media Bay option
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION:
To prevent damage to electrical components, properly ground the server before
beginning any installation procedure. Improper grounding can cause ESD.
Summary of Contents for BCDVideo BCD108
Page 71: ...Hardware options installation 71 7 Install the GPU support bracket 8 Install the riser cage ...
Page 92: ...Hardware options installation 92 o Primary PCI riser cage o Secondary PCI riser cage ...
Page 96: ...Hardware options installation 96 3 Remove the hot plug fan or fan blank from fan bay 1 ...
Page 152: ...Support and other resources 152 ...
Page 153: ...Support and other resources 153 ...