
Chapter 3
Preparing Superdome for Booting
Unpacking and Installing the Blower Housings and Blowers
31
Unpacking and Installing the Blower Housings and Blowers
There are two blower housings and four blowers for each SPU cabinet. Although similar in size, the blower
housings for each SPU cabinet are not the same; one has a connector to which the other attaches. Use the
following procedure to unpack and install the housings and blowers:
Step 1. Unpack the housings from the cardboard box and set them aside.
The rear housing is labeled Blower 3 Blower 2. The front housing is labeled Blower 0 Blower 1.
CAUTION
Do not lift the housing by the stiffener. You can damage it.
Figure 3-1Blower Housing Stiffener
Step 2. Remove the cardboard from the blower housing.
5/31/01
60IN030A
Blower Housing Stiffener
Handles
Summary of Contents for 9000 Superdome
Page 8: ...Contents 8 ...
Page 9: ...9 Preface ...
Page 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Page 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Page 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Page 24: ...24 ...
Page 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Page 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Page 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Page 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Page 193: ...Appendix F 169 F A180 Support Management Station ...
Page 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Page 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...