
1
2
2
2
2
7.
Install the drive.
1
2
8.
Connect each power cord to the server.
9.
Connect each power cord to the power source.
11. If removed, install the security bezel
.
To configure arrays, see the
HPE Smart Storage Administrator User Guide
on the
.
Installing a hot-plug drive
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless all bays are
populated with either a component or a blank.
Procedure
1.
If installed,
.
2.
Remove the drive blank.
40
Installing a hot-plug drive