Hovr HOVR-94X1.5 Basic Installation Manual Download Page 1

BASIC INSTALLATION GUIDE

BASIC INSTALLATION GUIDE

INSTALLATION HARDWARE

INSTALLATION HARDWARE

8 x 2 1/2” Pan Head Screws (per 4 ft 

of bracket)
25 x 1 1/4” Pan Head Screws (per 4 

ft of bracket)

4 x 3/4” Set Screws (per 4 ft of 

bracket minimum)

1 x 3/16” Cobalt Drill Bit

1 x Hex Key

BITS REQUIRED

BITS REQUIRED

17/64” HSS Steel Drill Bit (Set 

Screw Install)

5/16” #18 HSS H3 Tap Bit (Set 

Screw Install)

Epoxy Glue (Glue Install)

TOOLS REQUIRED

TOOLS REQUIRED

Tape Measure

Electric Drill

Level

Stud Finder 

(Router)
(Table Saw)

hovrsolutions.com/learn

Hovr Strong Solutions (the “Company”) makes no representation or warranty as to the suitability of its products for any particular purpose, use, or installation, nor does it make any suggestion as to the method by 

which any of its products should be installed. The Company makes no suggestion nor shall be taken to provide any instruction on any tools, equipment or machinery used in any way in connection with its products, 

and strongly suggests that the consumer consult with and abide by any user manuals or instructions provided by the manufacturer of any utilized tools, equipment or machinery and at any time they are used, that 

such use is conducted in a safe and lawful manner. It is the responsibility of the consumer to ensure the correct usage of any tools, equipment, or machinery utilized at any time in connection with any Company 

products.

 

The information provided in any video by the Company is not intended as, and shall not be understood or construed as, advice or instruction in the operation of any tools, equipment, or machinery for use in connection 

with any Company products. Neither the Company, nor any of its employees, agents or anyone else for whom it is at law responsible shall be held liable or responsible for any loss, damage, or injury stemming from the 

use of any tool, equipment, or machinery utilized by a consumer in connection with any Company products.

BASIC INSTALLATION GUIDE

BASIC INSTALLATION GUIDE

[email protected]
(844) 574-2307

WHAT YOU NEED

WHAT YOU NEED

There are 3 methods to create the channel: Hand chisel, router, 

or, for the professionals, using a dado blade/table saw. The 

most common method is to router out the back of your shelf to 

make the room for the female bracket. It is important to note 

that the bottom of the bracket is .80mm longer than the top. We 

recommend having the the top of the bracket .40mm (a fingernail) 

recessed from the shelf & a .40mm overhang for the bottom. This 

is to allow for the bracket to slightly embed itself into the drywall 

to prevent any unwanted rocking once installed.

STEP 1 - CREATE CHANNEL

STEP 1 - CREATE CHANNEL

Use the 1 1/4” pan head screws to secure the bracket to your 

shelf. Please use 1 screw per hole. 

STEP 2 - ATTACH FEMALE BRACKET

STEP 2 - ATTACH FEMALE BRACKET

Option 1: You will need to drill & tap the holes in the bottom of the 

shelf to accommodate the threaded set screws for the bracket that 

we will be using to secure the two components together towards 

the end of the installation process.

Option 2: You either can use epoxy glue only to secure both brack-

ets together later in the installation or combine both methods. 

Epoxy is a more permanent installation.

STEP 3 - DRILL SET SCREW HOLES

STEP 3 - DRILL SET SCREW HOLES

You will need to drill the necessary holes into the male bracket. 

Please use the 3/16” tapper bit. The reason we don’t predrill 

the bracket is due to the vast variety in stud separation in each 

individual case. It is recommended to find a minimum of 2 studs. 

Mark your studs on the bracket & ensure you drill your holes 

centered on the provided top & bottom dyelines on the bracket. 

STEP 4 - PREPARING THE MALE BRACKET

STEP 4 - PREPARING THE MALE BRACKET

Have a question? Visit our help 

center! hovrsolutions.com/learn

Reviews: