4.3.3 Design examples for
room air independent operation
UltraGas
9
6
8
5
7
4
3
2
1
If necessary, insert an
inspection T-piece
Combustion air
Example UG K3 C80/125 PP
1
Connecting assembly kit LAS to UltraGas
®
(15-50) and
Boiler connection piece E80 ->C80/125 PP, L = 200 mm
2
Inspection T-piece C80/125 PP with measure opening
3
Duct C80/125 Wall plate with splice 220 x 220 mm
Scabbard tube D = 150 mm, L = 300 mm
4
Length element E80 L = 450 mm PP
5
Bearing rail E Flue gas tube support in shaft
6
Support arch E80 - 90° PP
7
Set (2 pieces) distant holder E80 of polypropylene
for tube centering in shaft; 3 sets
8
End tube E80 L = 500 mm to top part 80 high grade steel
9
Top part 80 for chimney end for back ventilation with
shaft cover 400 x 400 mm, clamp tape and seal ring
Assembly kit
UG K C80/125 PP
UG K C80/125 Flex PP
0
2
4
6
8
10
12
14
16
18
20
22
24
26
0
1
2
3
4
5
6
UltraGas
®
(35)
UltraGas
®
(50)
UltraGas
®
(15)
UltraGas
®
(20)
UltraGas
®
(27)
Maximum horizontal length connecting pipe (m)
Maximum ef
fective height flue gas pipe (m)
UltraGas
®
(35-50)
Assembly kit UG K3 C100/150 PP
Assembly kit UG K3 C100/150 Flex PP
0
4
8
12
16
20
24
0
1
2
3
4
5
6
UltraGas
®
(50)
UltraGas
®
(35)
Maximum horizontal length connecting pipe (m)
Maximum ef
fective height flue gas pipe (m)
17
4 217 213 / 01
ASSEMBLY
Summary of Contents for UltraGas 15
Page 48: ...48 4 217 213 01...
Page 49: ...49 4 217 213 01...