4.4.
Installation and connection conditions
The installation conditions shown here must be complied with. Installation is only allowed
to be performed by specialist personnel.
1. Prior to commissioning, the CHP plant must be placed on the sound insulation
underlays included in the scope of delivery. See Fig. 2
Figure 2