H. Final Checklist
1) Is the icemaker level?
2) Are all components, fasteners, and thumbscrews securely in place?
3) Is there at least 24" (61 cm) minimum clearance around the condensing unit?
4) Have the shipping carton, tape, and packing material been removed from the icemaker
and condensing unit? Are the cube guides and tank separator in their correct positions?
5) Is the icemaker in a site where the ambient temperature is 45°F to +100°F (7°C
to 38°C) all year around?
6) Have all electrical, water, and refrigerant connections been made? Are line sets
tightened, secured, and free of kinks?
7) Does the electrical installation meet all national, state, and local codes and regulations?
Has the power supply voltage been checked or tested against the nameplate rating?
Has a proper ground been installed to the condensing unit and icemaker unit? On
three phase model, has the transformer's voltage tap switch been positioned to match
incoming voltage? For details, see section "II.F. Electrical Connection."
8) Has the electrical power supply been on to the condensing unit for a minimum of
4 hours?
9) Are the water supply line shut-off valve and drain valve installed? Has the water
supply pressure been checked to ensure a minimum of 10 PSIG and a maximum of
113 PSIG?
Note: The icemaker may stop running when the water supply is off, or if the pressure is
below 10 PSIG.
10) Are the compressor hold-down bolts snug? Have the refrigerant lines been checked to
make sure they do not rub or touch other lines or surfaces?
11) Has the bin control been installed and checked for correct operation? To confirm bin
control operation, press the bin control's actuator paddle during the first 5 minutes of
the freeze cycle. The icemaker should stop within 15 seconds.
12) Were all tank hoses and thumbscrews reconnected and secured after installing the bin
control?
Note: Confirm that there is no gap behind the bin control bracket.
13) Has the end user been given the instruction manual, and instructed on how to operate
the icemaker and the importance of the recommended periodic maintenance?
14) Has the end user been given the name and telephone number of an authorized service
agent?
15) Has the warranty card been filled out and forwarded to the factory for warranty
registration?