![Hoshizaki Serenity KMS-2000MLJ Service Manual Download Page 10](http://html1.mh-extra.com/html/hoshizaki/serenity-kms-2000mlj/serenity-kms-2000mlj_service-manual_2164866010.webp)
10
F/S
open
F/S
chec
k
• Minim
um fr
eez
e time:
5 min.
• Maxim
um fr
eez
e time:
fr
eez
e timer set
ting
(S4 dip s
witch 9 & 1
0)
Components Ener
giz
ed when the Contr
ol S
witc
h is in the "SER
VICE" P
osition
W
hen in the "SER
VICE" position, the contr
ol s
witch supplies po
w
er t
o the ser
vice s
witch and the icemak
er is in ser
vice mode
.
The ser
vice s
witch has thr
ee positions:
"DRAIN," "CIRC
." and "W
A
SH." See the inf
or
mation belo
w f
or det
ails of each function.
DRAIN
P
ow
er is supplied t
o the pump mot
or and dr
ain v
al
ve
. This dr
ains the w
at
er t
ank.
CIRC
.
P
ow
er is supplied t
o the pump mot
or onl
y.
This oper
ation can be used t
o cir
culat
e cleaner
and sanitiz
er o
ver the outside surf
ace of the e
vapor
at
or f
or e
xt
ended per
iods of time
.
WA
S
H
P
ow
er is supplied t
o the pump mot
or and w
ash v
al
ve
. This oper
ation is used t
o cir
culat
e
cleaner and sanitiz
er o
ver both the inside and outside surf
aces of the e
vapor
at
or
.
4.
P
ump-Out Cy
cle
1.
1
-Min
ut
e
F
ill Cy
cle
2.
Har
vest Cy
cle
3.
F
reez
e Cy
cle
Cy
cle
St
eps
WV
ener
giz
ed
F/S
closed
WV
contin
ues
Comp
ener
giz
ed
FMRs
ener
giz
ed
HGVs
ener
giz
ed
Ther
mist
or t
emper
atur
e
reaches 48
°F (9°C)
(3.9 k
Ω
or less)
Har
vest timer st
ar
ts
.
F/S
open
Comp
contin
ues
FMRs
contin
ue
PM
contin
ues
LL
Vs
ener
giz
ed
HGVs
de-ener
giz
ed
Comp
contin
ues
FMRs
contin
ue
HGVs
ener
giz
ed
DV
ener
giz
ed
PM
de-ener
giz
es f
or 2 sec.,
then ener
giz
ed f
or 1
0/20 sec.
LL
Vs
de-ener
giz
ed
F/S
chec
k
•
WV time:
6 min.
or the length of har
vest min
us
HPT set
tings (S4 dip s
witch 6), whiche
ver is
shor
ter
.
• Maxim
um har
vest time:
20 min.
Ther
mist
or
in contr
ol
1 t
o 3-min.
timer in contr
ol
(S4 dip s
witch 1 & 2)
St
ar
tup
begins
her
e af
ter
5-sec.
dela
y
If
F/S
is open, C
omp and FMRs de-ener
giz
e and c
ycle r
etur
ns t
o 1
-min
ut
e fi
ll c
ycle
• F
act
or
y set f
or e
ver
y
10th c
ycle
.
(S4 dip s
witch 5)
•
P
ump mot
or st
ops f
or
2
sec., then ener
giz
ed
for 1
0/20 sec.
(S4 dip s
witch 3 & 4)
PM
ener
giz
ed
WV
de-ener
giz
ed
Har
vest P
ump Timer
Leg
end:
BC
-bin contr
ol
Comp
-compr
essor
D
V-
dr
ain v
al
ve
FMRs
-f
an mot
or
s-r
emot
e
F/S
-fl
oat s
witch
HGVs
-hot g
as v
al
ves (KMS and SRK)
LL
Vs
-liquid line v
al
ves (KMS and SRK)
PM
-pump mot
or
WV
-inlet w
at
er v
al
ve
Oper
ation Flo
w Char
t
Anti-Slush
Ther
mist
or
temper
atur
e
dr
ops t
o 36
°F
(2.2°C) (5.8
kΩ
or mor
e).
PM
de
-ener
giz
es
for 1
0 sec.
50 sec.
FS
in contr
ol
FS
closed
5-min.
minim
um
fr
eez
e timer in
contr
ol
FS
opens or fr
eez
e
timer t
er
minat
es
When fr
eez
e time dif
fer
ential e
xceeded,
fr
eez
e-time cor
rection c
yc
le star
ts.
See "II.A.3.
F
reez
e-Time Cor
rection Char
t."
II. Sequence of Operation and Service Diagnosis
A. Sequence of Operation Flow Chart
1. Operation Flow Chart