![Hoshizaki LANCER S4E V3 Hi-Carb Superchiller Instructions Download Page 1](http://html1.mh-extra.com/html/hoshizaki/lancer-s4e-v3-hi-carb-superchiller/lancer-s4e-v3-hi-carb-superchiller_instructions_2165446001.webp)
www.lancerbeverage.com
Page 1 of 5
Images are for illustration purposes only as product may vary.
Part No 68000132
No 091-2 7 April 2020
INSTRUCTIONS FOR S4E V3
AGITATOR REPLACEMENT WITH IEC
HARNESS
Instruction guide to installing IEC Plug Harness to a S4E V3 Lancer Superchiller. This will reduce the potential
of future agitator motor replacements requiring electrical termination or modifications.
Tools and equipment required
Parts required
Pliers
80000288 - MOTOR ASSY AGI ECR1 IEC
Screwdriver – Phillips (PH2)
83000542 - HARNESS AGI IEC/SPADE ASSY
Hacksaw
79135936 - SCREW M5 X16 SS PH
Drill
79150056 - NUT M05 [HEX] SS
6mm drill bit
83000034 – P-Clip
Test & Tag Equipment
Gloves and Safety Glasses
STEP 1 – Electrical isolation and access.
1.1
Isolate the chiller and remove the electrical
lead from the power outlet.
1.2
Remove the electrical box and chiller lids.
1.3
Disconnect the agitator motor leads from the control board and remove the agitator from the water bath
cradle.
Warning
As this work requires changes to the electrical wiring it should only be
performed by a fully trained & certified technician.
APPLIANCE MUST BE ISOLATED FROM ELECTRICAL SUPPLY BEFORE
COMMENCING ANY SERVICE OR MAINTENANCE WORK.
AGITATOR MOTOR
CONTROL BOARD
ELCTRICAL BOX
AGITATOR MOTOR
Control Board