Hoshizaki LANCER S4E V3 Hi-Carb Superchiller Instructions Download Page 1

www.lancerbeverage.com

 

Page 1 of 5 

Images are for illustration purposes only as product may vary.

 

Part No 68000132 

No 091-2    7 April 2020

 

INSTRUCTIONS FOR S4E V3 

AGITATOR REPLACEMENT WITH IEC 

HARNESS

 

Instruction guide to installing IEC Plug Harness to a S4E V3 Lancer Superchiller.  This will reduce the potential 
of future agitator motor replacements requiring electrical termination or modifications. 

Tools and equipment required

 

Parts required 

Pliers   

80000288 - MOTOR ASSY AGI ECR1 IEC     

Screwdriver – Phillips (PH2) 

83000542 - HARNESS AGI IEC/SPADE ASSY 

Hacksaw 

79135936 - SCREW M5 X16 SS PH 

Drill 

79150056 - NUT M05 [HEX] SS 

6mm drill bit 

83000034 – P-Clip 

Test & Tag Equipment 
Gloves and Safety Glasses 

STEP 1 – Electrical isolation and access. 

1.1 

Isolate the chiller and remove the electrical 
lead from the power outlet.  

1.2 

Remove the electrical box and chiller lids. 

1.3 

Disconnect the agitator motor leads from the control board and remove the agitator from the water bath 
cradle. 

Warning 

As this work requires changes to the electrical wiring it should only be 
performed by a fully trained & certified technician. 
APPLIANCE MUST BE ISOLATED FROM ELECTRICAL SUPPLY BEFORE 
COMMENCING ANY SERVICE OR MAINTENANCE WORK. 

AGITATOR MOTOR 

CONTROL BOARD 

ELCTRICAL BOX 

AGITATOR MOTOR 

Control Board 

Reviews: