20
5) Connect the bin control cable connector to wire harness connector A coming from the
control box.
Note:
• Wire harness has one connector (connector A) to plug into the bin control cable and
another connector (connector B) for use if an upper unit is installed.
• Wire harness is connected to the control board red K4 connector.
6) Make sure the bin control cable and wire harness are secured in the wire saddles and
do not interfere with any components.
7) Replace the panels and storage bin baffle in their correct positions unless you are
installing an upper unit. If installing an upper unit, see "II.D.3. Installation of Upper Unit."
3. Installation of Upper Unit
1) See "II.D.1. Dispenser Unit/Ice Storage Bin and Icemaker Setup" and "II.D.2. Bin Control
Installation" for the lower unit installation.
2) Remove the top panel and the top insulation of the lower unit. The top panel and the top
insulation of the lower unit are not required when installing an upper unit.
3) Unpack the upper unit and remove the shipping carton, tape, and packing material.
4) Remove the panels of the upper unit.
5) Stack the upper unit on top of the lower unit.
6) Secure the upper unit to the lower unit using the 2 mounting brackets and the bolts
provided. See Fig. 5. Note: When stacking air or water models, or KM-1301 or KM-1601
remote models, on top of KM-1900, KM-2200, or KM-2600 remote models, use 5×12
self-tapping screws (not provided) to secure mounting brackets to the upper model.
NOTICE!
Do not use screws longer than 12 mm (1/2"). Screws longer than 12 mm
(1/2") will puncture evaporator case.
Fig. 5
Icemaker
(Upper Unit)
Icemaker
(Lower Unit)
Mounting
Brackets
Bolts
Ice
Storage
Bin
KM-1900SRJZ/3, KM-2200SRJZ3,
KM-2600SRJZ3
Icemaker
(Upper Unit)
Icemaker
(Lower Unit)
Bolts
Ice
Storage
Bin
Mounting
Brackets
KM-1301S_J(Z)/3, KM-1601S_J(Z)/3,
KM-1900SAJ/3, KM-1900SWJ/3,
KM-2200SWJ3, KM-2600WJ3