![Hoshizaki C-100BAF-AD Service Manual Download Page 9](http://html1.mh-extra.com/html/hoshizaki/c-100baf-ad/c-100baf-ad_service-manual_2164926009.webp)
9
B. Sequence of Operation
This icemaker utilizes a thermostatic bin control to switch the gear motor, fan motor, and
compressor on and off as needed. This icemaker utilizes a float-operated water valve in
the water reservoir to allow water into the icemaker as needed. After the power switch is
placed in the "ON" position, the sequence is as follows:
1. Freeze Cycle
GM, FM, CR, and Comp energize. As the water in the evaporator cools, ice starts
forming within 4 to 6 minutes. This time frame depends on the inlet water and ambient
temperature conditions.
The float-operated water valve allows water into the reservoir as needed to continue the
ice making process. This continues until BC shuts down the icemaker or power is turned
off to the icemaker.
2. Bin Control Thermostat Shutdown
Ice fills storage bin to level of BC. When BC opens, GM, FM, CR, and Comp de-energize.
When ice level lowers and BC closes, the icemaker starts operating again.
C-100BAF Series Sequence Flow Chart and Component Operation
2. Shutdown
1. Freeze Cycle
The float-operated water valve allows
water into the reservoir as needed to
continue the ice making process.
When BC opens, the icemaker shuts
down. When BC closes, the icemaker
starts operating again.
Full Bin
BC
closed
GM
energized
FM
energized
CR
energized
Comp
energized
Power Switch
"ON"
BC
closed
GM
continues
FM
continues
CR
continues
Comp
continues
BC
open
GM
de-energized
FM
de-energized
CR
de-energized
Comp
de-energized
BC
open
BC
closed
Legend:
BC
–bin control thermostat;
Comp
–compressor;
CR
–compressor relay;
FM
–fan motor;
GM
–gear motor