Commissioning
NOTE
These work activities may be carried out only by
persons trained by HORSCH for this purpose.
WARNING
Increased danger of accidents during commis-
sioning.
¾
Observe the notes in the safety chapter.
Delivery
The machine with implements is normally de-
livered completely assembled on a low loader.
If parts or assembly groups had to be disas-
sembled for transport purposes, these will be
assembled locally by our distributor or field
technician.
Depending on the design of the low loader the
machine can be unloaded with a tractor, or
needs to be lifted off with suitable lifting gear
(forklift truck or crane).
¾
Use only lifting equipment and lifting gear with
adequate lifting capacity and approval!
Lifting and lashing points are identified by labels.
When using other lifting points pay careful at-
tention to the centre of gravity and the weight
distribution. These points must, in any case, only
be on the frame of the machine.
Machines with E-Manager
On machines with the E-Manager drill controls
the hydraulic function "Lift/Lower" is possible
without any additional installation work.
These machines can be unloaded from the low
loader without having to install the basic equip
-
ment beforehand.
The other hydraulic functions such as "Folding"
or "Bout marker" can only be operated after the
basic equipment has been installed on the tractor.
Transport
Depending on country-specific regulations and
working width the equipment can be transported
on public roads either attached to a tractor or on
a trailer or low loader.
¾
The permissible dimensions and weights for
transport must be complied with.
¾
The tractor must be large enough so that
sufficient steering and braking abilities are
ensured.
¾
If the machine is hitched up in two-point mode,
the tractor link arms must be blocked against
swinging sideways.
¾
On a trailer or low loader the machine must
be secured with tensioning straps or other
means.
¾
Attach lifting tackle only at the specially
marked points.
Installation
Instruction of the operator and initial installation
of the machine will be carried out by our service
engineers or distributors.
Any prior use of the machine is prohibited
The machine can only be released for opera-
tion after the instruction session conducted by
our service engineer / distributor and after the
operating instructions have been read.
WARNING
Increased danger of accidents during installation
and maintenance.
¾
Read these operating instructions and become
acquainted with the machine before starting
this work.
Depending on scope of equipment
¾
Take loose parts supplied off the machine!
¾
Remove all parts from the hoppers.
¾
Check all important screw connections!
¾
Lubricate all grease nipples!
¾
Check air pressure in tyres.
¾
Check all hydraulic connections and hoses
for correct fastening and function!
¾
Immediately rectify any occurring damage or
have it corrected!
The installation of the drill controls is de-
scribed in the corresponding instruction
manual.