![horsch Maestro 12.45 CV Operating Instructions Manual Download Page 72](http://html1.mh-extra.com/html/horsch/maestro-12-45-cv/maestro-12-45-cv_operating-instructions-manual_2164095072.webp)
NOTE
¾
All distributor components must be leak tight.
Even slightest leaks and air losses will cause
uneven distribution.
¾
During use the distributor tower must be
aligned vertically, as otherwise the fertiliser
will be distributed unevenly across the width
of the machine.
Coulter pressure
During drilling the weight of the frame presses
the coulter discs into the ground until the depth
guide rollers rest on the ground.
Hydraulic coulter pressure
The hydraulic cylinders for the coulter pressure
transfer additional pressure on the drill units,
see chapter
Hydraulics
.
Coulter pressure hydraulic cylinder
¾
Adjust the coulter pressure on the terminal,
see the operating instructions for the drill
controls as well as for
AutoForce
.
¾
Check the activation of the coulter pressure
on the pressure gauge:
1
2
1 set coulter pressure
2 maximum possible coulter pressure
68
69
Summary of Contents for Maestro 12.45 CV
Page 2: ......
Page 5: ......
Page 27: ...Maestro 8 CV 5470 665 3900 6500 3000 5900 8 70 CV 6360 8 75 CV 6570 8 80 CV 6790 23...
Page 28: ...5470 6500 3900 615 3000 Maestro 9 CV 6700 9 70 CV 7590 9 75 CV 7160 9 80 CV 7590 24...
Page 29: ...Maestro 12 CV 5550 6500 665 3900 3000 6790 5900 25...
Page 145: ...WARNING Never park the machine unsecured with the axle dismantled 141...
Page 154: ......