![horsch Leeb 5.280 VL Operating Instructions Manual Download Page 255](http://html1.mh-extra.com/html/horsch/leeb-5-280-vl/leeb-5-280-vl_operating-instructions-manual_2164087255.webp)
Draining the spraying mixture container
via the pressure output
Water systems Basic Pro and CCS Pro
Pressure
output
1.
Couple a discharge hose with 2″ Camlock
coupling on the pressure output.
NOTE
Drainage output can be controlled with the ball
valve.
If the valve is fully open, the pump delivers with
full output via the pressure output.
2. Switch on the circulation on the terminal.
3. Drain the spraying mixture container.
4.
After drainage switch off the circulation to
shut off the pump.
5. Close the ball valve and remove the dis-
charge hose.
6. Close the pressure output with the cap.
250
251
Summary of Contents for Leeb 5.280 VL
Page 2: ......
Page 5: ......
Page 11: ...7...
Page 219: ...Diagram a with example 215...
Page 225: ...221...
Page 228: ...5 1 2 8 9 10 13 12 23 26 28 224...
Page 230: ...26 39 40 42 43 45 226...
Page 234: ...44 1 2 5 8 9 10 16 25 12 14 230...
Page 236: ...44 50 45 44 47 48 232...
Page 279: ...Central frame middle frame tractor link arm Parallelogram lock 275...
Page 307: ......