![horsch LEEB 4 LT Operating Instructions Manual Download Page 49](http://html1.mh-extra.com/html/horsch/leeb-4-lt/leeb-4-lt_operating-instructions-manual_2164086049.webp)
3.8 Fluid circuit - function
See also "Fluid circuit - components"
a
c
m
n
h
i
k
l
b
d
e
f
g
o
1) Filling
In filling mode, the externally sucked in fluid is
drawn in through the spraying pump
(a)
either
•
directly into the solution tank
(c)
or
•
to the agitator of the solution tank
(m)
or
•
to the injector
(h)
induction hopper
(i)
.
This draws preparations out of the induction
hopper into the solution tank.
The fluid supplies the rinsing nozzles
(k)
, the
shock nozzle
(l)
and the canister flushing of
the induction hopper. Function of the induc-
tion hopper only possible from 100 litre tank
content
(c)
!
2) Suction
The spraying pump
(a)
draws fluid through the
suction fitting
(b)
(electric ball valve) from the
solution tank
(c)
(spraying operation) or out of the
fresh water tank
(d)
(to clean the spraying system).
i
k
l
48
49
Summary of Contents for LEEB 4 LT
Page 4: ......
Page 6: ......
Page 32: ...1 19 Position of safety stickers 32...
Page 33: ...i 33...
Page 146: ...Diagram a with example 146...
Page 161: ......