![horsch LEEB 4 LT Operating Instructions Manual Download Page 47](http://html1.mh-extra.com/html/horsch/leeb-4-lt/leeb-4-lt_operating-instructions-manual_2164086047.webp)
3. Design and
function
3.1 Control unit
The external control terminal, filling connections
and illuviation valve are arranged in travel direc-
tion on the left hand side.
External control terminal, filling connections and
illuviation valve
NOTE
For machines with the CCS Pro equipment there
is a storage box next to the external control
terminal. The personal protective outfit can be
stored here.
3.2 Connections
Overview of connections
1
2
3
4
6
5
1
Pressure filter
2
Solution tank direct filling
3
Suction connection for solution tank filling
4 Filling port for fresh water tank
5 Spraying mixture tank residue drain
6 spraying mixture tank pressure output
3.3 Folding boom
The folding boom has 5 or 7 sections depending
on the version.
It can be operated in two different working widths
(full and reduced).
NOTE
Collision protection with fully extended
working width. With reduced working width
pay attention to any obstacles around the
outside of the machine!
¾
For possible folding boom versions see the
chapter Folding boom folding variants.
MF
47
Summary of Contents for LEEB 4 LT
Page 4: ......
Page 6: ......
Page 32: ...1 19 Position of safety stickers 32...
Page 33: ...i 33...
Page 146: ...Diagram a with example 146...
Page 161: ......