Installation Step 5: Electrical Power
AC Source Requirements: Operating Voltage: 230 VAC ± 10% (under load) @ 50/60Hz; 15 Amps
maximum, single phase.
The Vertex Edge system requires a dedicated AC source rated at 230 VAC @ 50/60Hz, 15 Amp
single phase providing hot, neutral, and ground lines. Line voltage should fluctuate no more
than ± 10%. The external switch must be clearly labeled and installed in accordance with local
electrical codes. Input power cable should be #14 AWG minimum. The safety ground wire must
be the same or larger gauge as the line wires. Connect AC power connection to the two-position
terminal block in the rear panel of the power module. Connect ground wire to the threaded stud
on the side rail of the rack.
NOTE
Testing has shown that using 208/220VAC phase-to-phase power source instead of the
recommended 230VAC phase-to-neutral, can result in voltage excursions on the system
ground. The excursions can cause damage to components in the analyzers. This type of
damage is most likely to occur during system power cycles or in cases where the supply
power is not a clean source. For applications where 230 VAC single phase power is not
available, Honeywell Analytics offers transformers to provide the necessary power.
NOTE
It is important to verify that all 5 of the AC connections to the PDU are fully connected. This
needs to be done before power up. Refer to See "System Components" on page
information. to identify these 5 AC connections.
Vertex Edge System
34
User Manual
Summary of Contents for Vertex Edge
Page 1: ...Vertex Edge 72 POINT CONTINUOUS MONITOR ...
Page 2: ......
Page 6: ......
Page 19: ...Chemcassette 1 Chemcassette directional flow Vertex Edge System 18 User Manual ...
Page 29: ...Installation Drawings Vertex Edge System 28 User Manual ...
Page 46: ......
Page 59: ...Vertex Edge System 58 User Manual ...
Page 63: ...Vertex Edge System 62 User Manual ...
Page 69: ...Vertex Edge System 68 User Manual ...
Page 91: ...Vertex Edge System 90 User Manual ...
Page 96: ...Vertex Edge System 95 User Manual ...
Page 98: ...1 Main power ON OFF switch 2 Analyzer power switches Vertex Edge System 97 User Manual ...
Page 165: ... September 2021 1998 2002_EN_RevA1_VertexEdge_UserManual Vertex Edge System 164 User Manual ...