CHAPTER
3
Installation
The installation procedure for the Vertex Edge System consists of six steps:
1. Surveying the Installation Site;
2. Optional Floor Mounting;
3. Installing Sample Lines;
4. Installing Pump Exhaust Line;
5. Electrical Power;
6. Data Acquisition System.
Installation Step 1: Surveying the Installation Site
A survey of the site helps you to make important decisions before installing your Vertex Edge
System. Topics in this section are intended to assist you with appropriate placement of the Vertex
Edge System and in determining if you have special filtering needs at the sampling location.
The site should:
l
Be remote from the monitored location;
l
Have sufficient ventilation for cabinet cooling;
l
Have power available; and
l
Be indoors in an area that is not subject to wide variations in temperature and humidity.
Note: The humidity is 20-65% RH and a temperature between 59°F to 95°F (15°C to 35°C).
Placement of the Vertex Edge System
Install the Vertex Edge System in an environmentally- protected site remote from the
manufacturing or storage locations that it monitors.
You can place the Vertex Edge System away from sample locations with sample tubing up to
400ft. (122m) length.
Exposure to Dust and Humidity
Exposure to corrosive gases or materials, excess moisture, dust and other unusual environmental
conditions could seriously hamper the unit’s monitoring ability and could cause damage to it.
Allow room around the Vertex Edge System for ventilation and servicing.
Vertex Edge System
26
User Manual
Summary of Contents for Vertex Edge
Page 1: ...Vertex Edge 72 POINT CONTINUOUS MONITOR ...
Page 2: ......
Page 6: ......
Page 19: ...Chemcassette 1 Chemcassette directional flow Vertex Edge System 18 User Manual ...
Page 29: ...Installation Drawings Vertex Edge System 28 User Manual ...
Page 46: ......
Page 59: ...Vertex Edge System 58 User Manual ...
Page 63: ...Vertex Edge System 62 User Manual ...
Page 69: ...Vertex Edge System 68 User Manual ...
Page 91: ...Vertex Edge System 90 User Manual ...
Page 96: ...Vertex Edge System 95 User Manual ...
Page 98: ...1 Main power ON OFF switch 2 Analyzer power switches Vertex Edge System 97 User Manual ...
Page 165: ... September 2021 1998 2002_EN_RevA1_VertexEdge_UserManual Vertex Edge System 164 User Manual ...