Replace an Analyzer
The Vertex Edge rack is designed for quick replacement of major components. You may replace
the Chemcassette analyzer while other analyzers continue to monitor.
WARNING: Do not connect or disconnect anything from the Power Distribution Unit (PDU)
while energized.
1. Turn off monitoring mode for the Analyzer to be replaced. In the left navigation panel, tap
Runtime Control
2. Tap on the Analyzer Monitor tab.
3. In Runtime Operation, tap on the Analyzer operation tab.
4. Tap Release and pull out the analyzer as far as possible
5. Tap the open the gate command if you wish to remove the Chemcassette. After removing the
Chemcassette put the optics protection cards in each optic block.
6. Close the gate.
Vertex Edge System
103
User Manual
Summary of Contents for Vertex Edge
Page 1: ...Vertex Edge 72 POINT CONTINUOUS MONITOR ...
Page 2: ......
Page 6: ......
Page 19: ...Chemcassette 1 Chemcassette directional flow Vertex Edge System 18 User Manual ...
Page 29: ...Installation Drawings Vertex Edge System 28 User Manual ...
Page 46: ......
Page 59: ...Vertex Edge System 58 User Manual ...
Page 63: ...Vertex Edge System 62 User Manual ...
Page 69: ...Vertex Edge System 68 User Manual ...
Page 91: ...Vertex Edge System 90 User Manual ...
Page 96: ...Vertex Edge System 95 User Manual ...
Page 98: ...1 Main power ON OFF switch 2 Analyzer power switches Vertex Edge System 97 User Manual ...
Page 165: ... September 2021 1998 2002_EN_RevA1_VertexEdge_UserManual Vertex Edge System 164 User Manual ...