Honeywell Life Safety AS, Po. Box 3514, N-3007 Drammen, Norway
http://www.hls-nordic.com
Installation:
Step 1:
Mount the socket either on the wall or in the ceiling. Connect the mains cables
L
,
N
and
GND
(optional)
to the terminal block. For maintained operation, a link wire must be present between
L
and
L1
. The
C1
and
C2
terminals are used for elBus communication (optional), DALI communication (optional) or
voltage free contact (optional). If open cabling is used, the knock-out in the luminaire must be removed.
Maintained
Non-maintained
Step 2:
Remove the battery cover, connect the battery and fasten the battery cover again.
Step 3:
Hook the luminaire to the hinge on the socket and swing the luminaire until the socket locks.
Service/maintenance:
Step 4:
First, remove the lens by carefully using a flat-bladed screwdriver at the marked positions.
Step 5:
Then, use a flat-bladed screwdriver to release the luminaire housing while lifting the lower part of the
luminaire off the socket.
Step 6:
If changing the battery, open the battery cover, disconnect the old battery and connect a new one.
UniLED
GB
1
2
3
6
5
4
Dimensional drawings: