Installation Guide
69-2285EFS—03
14
Slide the cover back into place and secure screw.
Turn on the water supply.
12
Plug in the TrueSTEAM power cord.
Press/release the GO button to ready
the TrueSTEAM for operation.
TrueSTEAM will ready itself after
five minutes if the GO button is not
pushed.
13
POWER
HUMIDIFYING
EMPTY
SERVICE
DRAINING
CLEANING
REQUIRED
DRAIN
GO
M24763A
M24762
Confirm that the furnace blower turns on to circulate air. This will take 10–15 minutes
after the call for humidity if TrueSTEAM is controlling the fan.
15
Turn the humidity control to the “Test” position. If the “Test” position is unavailable,
turn the control to a high setpoint (60% +). Be sure to return the setpoint to the desired
level when testing is complete. “Off” will turn TrueSTEAM off.
14
startup and checKout
allow truesteam to produce steam, then check all water line connections to ensure
there are no leaks before leaving the job site.