Honeywell T5820XL Installation And Service Manual Download Page 1

T5820XL Honeywell Planning, Installation and Service

Guide

HWDOC-X546-en-A

August 2018

Summary of Contents for T5820XL

Page 1: ...T5820XL Honeywell Planning Installation and Service Guide HWDOC X546 en A August 2018 ...

Page 2: ...al Sàrl While this information is presented in good faith and believed to be accurate Honeywell disclaims the implied warranties of merchantability and fitness for a purpose and makes no express warranties except as may be stated in its written agreement with and for its customer In no event is Honeywell liable to anyone for any direct special or consequential damages The information and specifica...

Page 3: ... using Wyse RPS for Experion TP THNCL2 3 17 2 4 5 Basic board configuration using Matrox Extio2 RPS for Experion ES C ES F TP RPSF02 18 2 4 6 Basic board configuration for PCUS dual LCN systems 18 2 5 Memory configuration 18 2 5 1 Standard memory configuration for 16GB using RDIMM 19 2 6 Workstation information 19 2 7 Workstation configuration 19 2 7 1 Workstation furniture option 19 Chapter 3 Ins...

Page 4: ...olutions 41 3 12 Remote Peripheral Solution 41 Chapter 4 Operation 44 4 1 Starting up your workstation 44 4 1 1 Turn on power and check status 44 4 1 2 Configuring RAID in Dell Precision T5820XL workstation 44 4 1 3 Check LCNP status 45 4 1 4 Set monitor resolution 45 4 2 Network connections 46 4 2 1 Ethernet network 46 4 2 2 Local Control Network 46 4 2 3 LCN connections 46 4 2 4 MAU connection 4...

Page 5: ... card 59 5 3 3 Replace add memory module 63 5 4 Installing the second LCNP4e2 card 64 5 5 Verifying BIOS settings 65 5 5 1 Entering the BIOS 66 5 5 2 BIOS settings for workstations with Tab 100 66 5 5 3 Exiting the BIOS 71 5 5 4 Spare parts 71 Chapter 6 Troubleshooting 73 6 1 Running the ePSA diagnostics 73 6 2 Preboot blinking power button codes 73 6 3 Known issues 75 5 ...

Page 6: ...nd or the LCNP board is removed Redundant ELCN Bridges are required if the ELCN node is communicating with any other existing coaxial based LCN node Some LCN nodes may have been replaced by their ELCN equivalent nodes and overall system features architecture will differ from that of a non ELCN integrated system LCN TPN system In this case it may be necessary to refer to appropriate ELCN documentat...

Page 7: ...lanning design for Experion servers clients controllers Process Operations Manual SW11 601 Process operations alarm message handling reporting history functions system operations system menu functions console station peripheral devices Integrated Experion TPS User s Guide EPDOC XX66 en 510A Supplementary installation and configuration tasks for Experion TPS Nodes Experion PKS R510 1 Migration Plan...

Page 8: ...lation processes for the TPS Process Network Release of R687 software Experion Control Building User s Guide EPDOC XX19 en 510A Procedures for basic tasks in the Control Builder application configuring hardware devices continuous control strategies sequential control strategies 1 1 Revision history Version Date Description A August 2018 Initial release 8 ...

Page 9: ...ay have an LCNP4e2 card installed allowing connection to the TotalPlant Process Network TPN coax through the LCN Media Access Unit MAU Additionally these platforms connect to the Ethernet through a standard Ethernet adapter card The Honeywell configured Dell Precision T5820XL workstation release for Experion is qualified on the Microsoft Windows 7 Professional 64 bit and Microsoft Windows 10 Enter...

Page 10: ...ounting 2 1 2 Software requirements The following are the Experion platform and software models Model number Description MZ PCWS93 Single CPU Quad Core Intel XEON 3 60GHz 2 1TB Hard Disks RAID1 16 GB DDR4 RDIMM ECC memory 2x8GB 120 240 VAC Single Dual Video EP COAWN7 Windows 7 Professional COA x64 64bit EP COAW10 Windows 10 COA EP COAWU7 Windows 7 Ultimate COA x64 64bit 2 1 3 BIOS configuration Al...

Page 11: ...Chapter 2 Planning 11 ...

Page 12: ... pin power cable 18 Front panel port 19 Power remote 20 USB 2_INT 21 System fan 0 22 USB 2_flex 23 Front panel USB3 2 port 24 Front panel USB3 1 port 25 SATA 0 1 2 3 4 5 and ODD 0 1 ports 26 VROC_key 2 3 Specifications l System specifications l Removable media specifications 2 3 1 System specifications Microprocessor Microprocessor Specification Tab 100 Single Intel Xeon Processor W 2123 3 60GHz o...

Page 13: ...cal disk drive Optical disk drive type Specification DVD One slim SATA ODD Video Video Specifications Video type nVIDIA Quadro P600 Video memory 2 GB minimum Maximum DP 1 4 Resolution HDR 5120 x 2880 at 60Hz 30 bit color 5K Display Support HDR 5120 x 2880 at 60Hz 30 bit color 4K Display Support HDR 4096 x 2160 at 60Hz or 3840 x 2160 at 60Hz Maximum DVI D DL Resolution 2560 x 1600 at 60Hz via 3rd p...

Page 14: ...thin the humidity Class Severity A2 limits 20 80 per ANSI ISA S71 01 1985 Standard Operating 8 to 85 non condensing Storage 5 to 95 non condensing Airborne contaminant level 300 angstroms month Copper Reactivity Level 3 mm3 m3 parts per billion H2S Gas concentration 10 mm3 m3 parts per billion S02 S03 Gas concentration 1 mm3 m3 parts per billion CI2 Gas concentration 50 mm3 m3 parts per billion NO...

Page 15: ... 20 4 inches 518 3 mm Weight Minimum 29 10 lbs Drive bays Drive bays Specifications Internal Four3 5 inches External One slim ODD One 5 25 inches External peripherals External peripherals Specifications Keyboard USB Windows compliant equivalent or better Mouse USB optical 2 button w scroll equivalent or better Drives Drives Specifications Diskette drives None Storage controller Integrated Intel R ...

Page 16: ...or the removable media 2 4 Specific slot configuration NOTE A Local Control Network Processor LCNP board and LCN Media Access Unit MAU are no longer used if the Workstation has been upgraded to be an ELCN node The Quad Video Graphics is the default option offered with the Honeywell Configured DELL T5820XL Workstation The following board configuration layouts will specify available system configura...

Page 17: ...en3 x8 Broadcom 5720 Dual Port adapter NOTE PCUS is not supported with FTE Incase of PCUS remove the Broadcom 5720 network card from the system 2 4 3 Basic board configuration for quad screen Experion ES C ES F FTE systems The following table describes the standard basic board configuration for quad screen Experion ES C ES F node FTE systems Slot number Slot type Description 6 PCI Empty or Power A...

Page 18: ...ng table describes the standard basic board configuration for dual LCN PCUS Slot number Slot type Description 6 PCI Empty or Power Adapter Harness 5 PCIe Gen3 x4 LCNP4e2 2 4 PCIe Gen3 x16 3 PCIe Gen3x1 LCNP4e2 1 2 PCIe Gen3 x16 nVidia Quadro P600 1 PCIe Gen3 x8 ATTENTION PCUS does not support FTE Enable the onboard NIC controller in the system BIOS to use it as an Ethernet 2 5 Memory configuration...

Page 19: ...at do not have the ISA card FE05 Fault Tolerant Ethernet Installation and Service Guide Installing and using FTE on a TPS or Experion node 2 7 Workstation configuration l Workstation furniture option 2 7 1 Workstation furniture option The Dell Precision T5820XL workstationcan be positioned vertically or horizontally when configured as a desktop unit The workstation can be mounted horizontally in H...

Page 20: ...n herein is applicable to the T5820XL workstation 3 1 Installation tasks The specific tasks you need to perform vary depending upon the type of furniture in which you are installing the workstation The following table lists the major platform installation tasks Task For more information refer to Be aware of all power and grounding requirements for your furniture Specific site requirements Section ...

Page 21: ...ly N A 120 VAC 220 VAC 1 024 Arms 0 54 Arms 124 Watt 120 Watt 3 3 Installing workstation in Icon Series console Perform the following procedure to install the workstation air dam and air gasket into the electronics enclosure of the Icon Series console ATTENTION In the following procedure left and right refer to viewing the electronics enclosure from the rear 3 3 1 To install workstation in Icon Se...

Page 22: ...lation slots at the bottom of the electronic enclosure near the front side of the workstation with the chamfers downward For this workstation the ventilation slots are at the right side The dam causes cooling air to be drawn down from the back panel area refer to the following Air flow and air dam arrangement figure 5 Test that the electronics enclosure can be closed and opened without binding Wit...

Page 23: ...ate connector on the monitors 6 If your console has an OEP connect the serial cable from the OEP adapter to the COM1 port of the workstation 7 If LCN MAU is present and is pre installed in the treadle area connect the LCN MAU cable to the MAU connector on the LCNP4e2 card If other networks are being used configure their MAU and cables appropriately 8 Connect one or two USB Hub cables to the workst...

Page 24: ...eywell configured workstation in a newly purchased Honeywell Z or EZ console The workstation is shipped from the Honeywell factory packaged in the OEM shipping carton of the manufacturer This procedure assumes that a new Z or EZ console is shipped from the Honeywell factory with workstation hardware pre installed l Z and EZ mounting requirements l Installing workstation in Z or EZ console 3 5 1 Z ...

Page 25: ...51405057 100 that are installed under the auxiliary power supply compartment of the Z EZ console base structure This cable management bracket is NOT used when installing Dell Precision T5820XL workstation in Z EZ consoles Instead cables are held in position by four 4 ribbon cable clamps P N 51103230 203 adhered to the inside surface of the left and right module mounting bracket 4 Place the worksta...

Page 26: ...tical return flange on the rear cover retaining bracket is approximately 127 mm 5 The following image illustrates the two retaining brackets P N 51405059 100 installed to position the rear surface of the workstation The workstation is positioned 127 mm 5 inches in front of the return flange on the rear mounting bracket P N 51403674 100 26 ...

Page 27: ...in the previous image 7 Secure the right and left bracket by tightening the M5 hex locknut as illustrated in the following image 8 Route the interface cables into the cable management area at the rear of the workstation The following image illustrates how interface cables are terminated to their respective connectors on the rear of the workstation chassis Any excess length is managed in the 127 mm...

Page 28: ... perform the following step to replace the rear cover 10 As illustrated in the following images slide the card file enclosure P N 51403117 100 into position and replace the rear cover P N 51405058 100 by engaging and tightening the two self captivated panel fasteners The installation procedure is complete 28 ...

Page 29: ... cabinet using slide mount option 3 6 1 Install workstation in LCN cabinet using fixed mount option 1 Remove both the front and rear console doors to access the workstation mounting location 2 Remove both front retaining brackets by unscrewing the two captivated panel fasteners securing each front retaining bracket 3 Slide the workstation on the lower flanges of the fixed side mounting brackets un...

Page 30: ...g bracket and the workstation chassis The following image illustrates the side spacer assembly 5 Ensure you insert the side spacer assembly on both sides of the workstation 6 Push the side spacers in until the handle is flush with the front flange of the side mounting brackets 30 ...

Page 31: ...cables to the workstation 9 Using two hex head screws and two grounding washers ensure you install a 3U high air duct baffle against the console right mounting rail 3 6 2 Install workstation in LCN cabinet using slide mount option 1 Remove both the front and rear console doors to access the workstation mounting location 2 Place the workstation on its side or top to expose the rubber feet on the bo...

Page 32: ... pads in the corners of the mounting tray This exposes a tacky surface that helps prevent the workstation from sliding 4 Place the workstation on the mounting tray such that the front edge of the workstation bezel is flush with the front surface of the mounting tray and centered side to side 32 ...

Page 33: ...e M5 hex nut to lock it in place 6 Using the tray handle push the tray to the fully closed position when the slide tray hits its rear stops 7 Insert the side spacer assembly between the side mounting bracket and the workstation chassis The following image illustrates the side spacer assembly 33 Chapter 3 Installing ...

Page 34: ... hex threaded standoff to lock each stop peg in place 11 If other workstations are not installed go to the section Connecting cables 3 7 Installing optional components Honeywell provides a number of other options that may be installed in the cabinet with your workstation Each of the following options is packaged with installation instructions Component Description OEP IKB adapter Used for connecti...

Page 35: ...e plug it into a USB port 4 Use the back USB ports for devices that typically remain connected such as a printer mouse and keyboard 5 If you are using SAW USB touchscreens or SAW serial touch screens through USB to serial connector cable connect the USB touch screen to USB port 6 Use the green line out port to attach headphones and most speakers with integrated amplifiers On workstations with a so...

Page 36: ...e lists the slot numbers for the making the cable connections Serial no Slot Card Connection from Connection to 1 1 Broadcom dual port NIC adapter RJ45 ports Network switch 2 2 Display card mDP connector DVI VGA convertor 3 3 LCNP4e2 Serial port from LCNP4e2 MAU 4 4 5 5 LCNP4e2 Serial port from LCNP4e2 MAU 6 6 Power adapter harness D type Female connector External SATA DVD drive power cable 3 8 2 ...

Page 37: ...er Monitor number Port 1 Monitor 2 Port 2 Monitor 1 Port 3 Monitor 4 Port 4 Monitor 3 NOTE POST will appear in Monitor 2 which is connected to Port 1 6 Secure any loose cables and verify that all cables have proper strain relief 3 9 Connecting to the Experion Orion console monitor 3 9 1 Single screen 4K display layout using nVidia Quadro P600 for Experion Orion Console When this platform is instal...

Page 38: ...ing block diagrams display the basic connections for the OEP IKB adapter assembly used in different configuration options Figure 3 2 OEP IKB adapter connections for OEP Figure 3 3 OEP IKB adapter connections for IKB 38 ...

Page 39: ... the supplied Velcro 3 If the IKB has a trackball connect it to the mouse PS 2 port on the workstation 4 Locate and connect the male end of the DB9 M F COM port cable 51196990 500 to the COM port on the OEP IKB module assembly adapter 51305776 100 5 Secure the connection by tightening the thumbscrews located on the cable end 6 Connect the female end of the DB9 M F COM port cable 51196990 500 to CO...

Page 40: ...2 to USB converter Then connect the PS 2 to USB to motherboard USB port 9 Take the DC power cable from the IKB OEP power supply adapter 51197184 100 and insert the round DIN plug into the power connector receptacle on the IKB OEP module assembly adapter 51305776 100 10 Connect the existing OEP IKB Keyboard HD15 cable to the HD15 OEP IKB receptacle located on the IKB OEP assembly adaptor 51305776 1...

Page 41: ...1 Dell Wyse Z90DE7 Thin Client RPS The Honeywell configured Dell Precision T5820XL workstation can be remotely accessed through the Dell Wyse Z90DE7 Thin Client RPS up to 4 monitors keyboard cursor movement devices audio and drives that can support CAT5 standard length The Dell Wyse Z90DE7 Thin Client RPS extends the audio video and USB signals through a network cable connection to the CPU of a re...

Page 42: ...ic cable and transceivers optionally The RPS solution initially implemented for Icon Series console and desktop configuration Refer to the Remote Peripheral Solution Configuration Rules document 51154865 The following table displays the model numbers for the RPS Model number RPS TP RPSF02 Remote Peripheral Solution Extio 2 up to 400 meters ATTENTION Before installing the Extio2 on T5820XL workstat...

Page 43: ... 43 Chapter 3 Installing ...

Page 44: ...tus l Configuring RAID in Dell Precision T5820XL workstation l Check LCNP status l Set monitor resolution 4 1 1 Turn on power and check status To turn on the power and check the status 1 Press the power button on the front panel of the workstation 2 Wait for the power light to turn solid white 4 1 2 Configuring RAID in Dell Precision T5820XL workstation ATTENTION You must perform the following ste...

Page 45: ...s prompting you to restart the workstation 15 Press Y to restart TIP It is always recommended to initialize the RAID volume inside the Intel RSTe console manager once the EPKS installation is complete and before start using in production environment For some reason when the RAID volume is shown in Verify Rebuild or Initializing state inside the Intel RSTe console application or in POST message it ...

Page 46: ...ble for FTE The on board Ethernet connection must be disabled in the System BIOS prior to installation of the Dual Port Broadcom 5720 NIC adapter The Network Controller Model Number is as follows NE NICS04 Broadcom Dual Port X1 GIGABIT NIC adapter 4 2 2 Local Control Network The connection to the LCN Network is made via the LCNP4e2 mid size Local Control Network Processor card model no TP LCNP05 T...

Page 47: ...strated in the following Figure Figure 4 1 Connect the MAU to Cable A and Cable B 4 2 5 Z Console connection to the LCN coax cable The mounting for the LCN MAU is located in the footrest area of the Ergonomic Z console The following illustrates the location of LCN MAU 47 Chapter 4 Operation ...

Page 48: ...U in Z Console To connect the LCN coax to LCN MAU in Z Console 1 Connect the color coded A cables to the color coded T connector on the BNC connector marked A 2 Connect the color coded B cables to the color coded T connector on the BNC connector marked B 48 ...

Page 49: ... workstation from an Icon Series console l Remove workstation from LCN cabinet l Open the enclosure 5 1 1 Shutdown workstation The following workstation shutdown procedure is applicable to workstations mounted in a Z or EZ Console or cabinet 1 Perform a double SHUTDOWN of the native window and a SHUTDOWN of the Windows operating system Refer to the Global User Station User s Guide for instructions...

Page 50: ...e of the cover slightly to allow the top detents to clear the top of the workstation You may have to push down on the bottom of the cover as you slide it toward you and off the workstation 3 Disconnect the cables that are connected to the back panel connectors of the workstation Do not disconnect the peripheral ends of the cables unless specifically instructed to do so Tag the cables so that they ...

Page 51: ...the workstation from a Cabinet 1 Open the rear cabinet door 2 Disconnect the cables that are connected to the back panel connectors of the workstation Do not disconnect the peripheral ends of the cables unless specifically instructed to do so Tag the cables so that they can be properly reconnected to the workstation 3 Open the front cabinet door 4 Remove the captivated panel fastener screws from t...

Page 52: ...3 Turn off power to the console station 4 From the back of the console remove the two retaining screws that secure the electronic enclosure to the lower valance 5 If you have the Power Work surface version stand to the side the enclosure lowers atomically Use the key to unlock the electronics enclosure and open the latch If you have an earlier version of Icon Series console hold the top of the ele...

Page 53: ...emove air gasket 8 Remove the workstation from the enclosure and set it on a secure surface 5 1 5 Remove workstation from LCN cabinet 5 1 6 Open the enclosure To simplify servicing when using the slide mount option internal hardware components can be serviced without having to remove the enclosure from the console or cabinet 53 ...

Page 54: ...NP4e2 l For servicing other Honeywell installed options refer to section Replacing adding optional components 5 2 Servicing the LCNP4e2 The LCNP4e2 board is soldered to the board and has an on board memory of 16 MB The LCNP4e2 board is utilized as the TPS co processor for the GUS and other workstations that require LCN connectivity It plugs into a PCI Express PCIe bus connector of these workstatio...

Page 55: ...tation from furniture 4 Access the inside of the electronics enclosure 5 Disconnect cables from the card being replaced WARNING Do not damage the EMI gasket fingers while removing installing boards CAUTION Use a grounding strap and grounded work surfaces and equipment when handling any electrostatically sensitive components such as the video cards NIC adapter cards and SCSI controller cards Store ...

Page 56: ...n 2 Press the blue color notch and push the cardholder back as illustrated in the following image 3 Wear a grounded ESD wrist strap grasp the LCNP4e2 card in PCIe slot 3 at the corners and gently remove the existing card 56 Chapter 5 Servicing ...

Page 57: ...ng adding optional components This section provides instructions for adding or replacing optional components in the workstation The video card is located in the PCI E slot 2 in the workstation l Replace add video card l Replace add the power adapter card l Replace add memory module 5 3 1 Replace video card Prerequisites Refer to the section Accessing the enclosure of the workstation and perform th...

Page 58: ...onents such as the video cards NIC adapter cards and SCSI controller cards Store and transport parts only in electrostatically safe containers To replace video card 1 Remove the side cover of the workstation 2 Locate the PCI slot 2 Press the blue color notch and push the cardholder back 3 Wear a grounded ESD wrist strap and remove the existing video card in the PCIe slot 2 4 Remove the existing vi...

Page 59: ...tion Installing for installing the workstation in the furniture 5 3 2 Replace add the power adapter card The power adapter card is located in the PCI slot 6 in the workstation Prerequisites Refer to the section Accessing the enclosure of the workstation and perform the following to access the power adapter card in the PCI slot 6 1 Shut down the workstation 2 Disconnect power from the workstation a...

Page 60: ...h as the video cards NIC adapter cards and SCSI controller cards Store and transport parts only in electrostatically safe containers To replace add the power adapter card 1 Remove the side cover of the workstation 2 Wear a grounded ESD wrist strap and remove the 6 SATA to LP4 female male power cable adapter 3 Locate the PCI slot 6 Press the blue color notch and push the cardholder back 60 Chapter ...

Page 61: ...Chapter 5 Servicing 4 Remove the board assembly from the PCI slot 6 as illustrated in the following 5 Insert the new power adapter card in PCI slot 6 61 ...

Page 62: ...6 SATA to LP4 female male power cable adapter 7 Connect the male end of the 6 SATA to LP4 female male power cable adapter to the female end of the 6 SATA to LP4 female male power cable adapter 62 Chapter 5 Servicing ...

Page 63: ... to the section Memory configuration for information about memory module configuration Prerequisites Perform all necessary procedures in section Accessing the enclosure of the workstation 1 Shut down the workstation 2 Disconnect power from the workstation and disconnect the attached cables 3 Remove the workstation from furniture 4 Access the inside of the electronics enclosure 5 Disconnect cables ...

Page 64: ...tion 5 Wear a grounded ESD wrist strap press the ejectors on the memory module socket down and out to remove the memory module from the socket 6 Insert the new memory module in the socket 7 Insert the memory shroud and close the side cover 5 4 Installing the second LCNP4e2 card 5 4 1 Prerequisites 1 Shut down the workstation 2 Disconnect power from the workstation and disconnect the attached cable...

Page 65: ...he workstation 2 Locate the PCI slot 5 Press the blue color notch and push the cardholder back 3 Remove the PCI slot 5 filler 4 Insert the second LCNP4e2 card 5 Replace the cardholder and ensure that the tab locks in its place 6 Replace the workstation cover and place the workstation in the furniture Refer to the section Installing for installing the workstation in the furniture 5 5 Verifying BIOS...

Page 66: ...figure The Dell Precision T5820 screen appears EE 5 5 2 BIOS settings for workstations with Tab 100 This section lists the BIOS settings configured in the factory for the workstation with a non raid platform System information Product name Honeywell Precision T5820XL workstation BIOS version 1 4 0 Service tag xxxxxx Asset Tag none Ownership Tag none Manufacture Date xx xx xxxx Owner ship Date xx x...

Page 67: ...ocessor Information Type Intel Xeon W 2123 CPU 3 60GHz Core Count 4 Processor ID 50654 Current Clock Speed 3600 MHz Minimum Clock Speed 1200 MHz Maximum Clock Speed 3600 MHz Processor L2 Cache 4096 KB Processor L3 Cache 8448 KB HT Capable Yes 64 Bit Technology Yes Intel EM64T Device Information SATA 0 none SATA 1 HDD1 SATA 2 HDD2 SATA 3 none SATA 4 none SATA 5 none ODD 0 DVD RW ODD 1 none Mini SAS...

Page 68: ...ption ROMs Enable Attempt Legacy Boot Date Time Date Time MM DD YY HH MM SS A P System Configuration Integrated NIC Enabled Serial Port COM1 SATA Operation RAID On Drives SATA 0 SATA 1 SATA 2 SATA 3 SATA 4 SATA 5 ODD 0 ODD 1 SMART Reporting Enable SMART Reporting USB Configuration Enable Boot Support Enable Internal USB ports Enable Rear USB ports Thunderbolt Disabled Audio Enable Audio Memory Map...

Page 69: ...assword Max Password Bypass Disabled Password Change Allow Non Admin Password Changes UEFI Capsule Firmware Updates Enable UEFI Capsule Firmware Updates TPM 1 2 Security Disabled Computrace R Deactivate Chassis Intrusion Enabled CPU XD Support Enable CPU XD Support OROM Keyboard Access Enabled Admin Setup Lockout Disabled Master Password Lockout Disabled Secure Boot Secure Boot Enable Disabled Exp...

Page 70: ...led USB Wake Support Disabled Wake on LAN Disabled Block Sleep Block Sleep S3 state Thermal Config Thermal Mode Auto PCIe Slot Zone 0 CPU Memory HDD Zone 0 Post Behavior Numlock LED Enable Numlock LED Keyboard Errors Enable Keyboard Error Detection Extend BIOS POST Time 0 seconds Full Screen Logo Disabled Warnings and Errors Disabled Manageability USB Provision Disabled MEBx Hotkey Enabled Virtual...

Page 71: ...e LinkSpeed Auto PCIe Bus Allocation Default SupportAssist System Resolution Auto OS Recovery Threshold 2 5 5 3 Exiting the BIOS To exit the BIOS settings 1 In System Setup choose File Save changes and exit A confirmation message appears 2 Click Yes 5 5 4 Spare parts Item Description Dell part number Honeywell part number Expansion Ram 8GB DDR4 MEM 1x8GB RDM FOR DELL 51156529 901 Display card nVID...

Page 72: ...ser must purchase the mDP to VGA converter directly from Dell using the Dell part number supplied in above table Honeywell does not supply this converter along with the workstation 72 Chapter 5 Servicing ...

Page 73: ...ollowing table explains the Power button LED state Power Button LED State Description Off Power is Off LED is blank Blinking Amber Initial State of LED at power up See the table below for Blinking Amber pattern diagnostic suggestions and possible failures Blinking White System is in a low power state either S1 or S3 This does not indicate a fault condition Solid Amber The second state of the LED a...

Page 74: ...own good coin cell battery if available S1 RCM 2 5 2 blinks followed by a short pause 5 blinks long pause then repeats BIOS Checksum Failure l System is in Recovery Mode l Flash latest BIOS version S2 CPU 2 6 2 blinks followed by a short pause 6 blinks long pause then repeats Bad Processor CPU configuration activity is in progress or a CPU failure was detected S3 MEM 2 7 2 blinks followed by a sho...

Page 75: ...d by a short pause 5 blinks long pause then repeats Memory configuration or incompatible error l Memory subsystem configuration activity is in progress No memory modules were detected l If customer can assist to troubleshoot narrow down the issue by removing one by one the memory on motherboard to determine which one failed Also combining the configuration to validate appropriate combination S9 MB...

Page 76: ...ed then the system will not power on QWERTY Keyboard on the Serial IKB is not working Connect QWERTY keyboard and trackball output to the PS 2 to USB converter Then connect the PS 2 to USB to motherboard USB port Unable to login RAID BIOS when Serial IKB with PS 2 converter are used Use the normal USB keyboard and mouse LCNP4E2 card not listing in BIOS None 76 Chapter 6 Troubleshooting ...

Page 77: ...nying the product in the documents or files accompanying such third party materials in a file named third_party_licenses on the media containing the product or at http www honeywell com ps thirdpartylicenses Documentation feedback You can find the most up to date documents on the Honeywell Process Solutions support website at http www honeywellprocess com support If you have comments about Honeywe...

Page 78: ...ell Process Solutions Customer Contact Center CCC To find your local CCC visit the website https www honeywellprocess com en US contact us customer support contacts Pages default aspx Training classes Honeywell holds technical training classes that are taught by process control systems experts For more information about these classes contact your Honeywell representative or see http www automation...

Reviews: