FUEL AIR RATIO CONTROL
COMMISSIONING
Commissioning Process
Commissioning the R7999 using the S7999D System Display
requires the following general steps:
1.
Connecting the R7999 to the S7999D and logging into
the system with a password. (This is the commissioning
password for the R7999 controller. The factory default is
"password" (without the quote symbols)). This prevents
unauthorized users from modifying the modulation curve.
2.
Specifying the base configuration: one or two fuels, with
or without FGR.
3.
Selecting system parameters such as Low Fire Hold.
4.
Specifying the characteristics of the actuators and
setting the valve/damper endpoints for those actuators.
5.
Creating a modulation curve (profile) for each fuel and
verifying it from maximum to minimum modulation.
(While you are commissioning the system, you must
monitor the burner operation with appropriate safety
instrumentation to verify the modulation curve.)
Commissioning Overview
The following table provides a step-by-step overview of how a
system is commissioned.
The Notes column in the table provide references to detailed
information when completing the more complex operations.
.
Table 3. S7999D Home Page Status Variables
Burner/boiler system
component
Status variable
Burner Control
Sequence state
Burner Control
Fault code
Burner Control
Flame Signal Strength
R7999
Fuel selection
R7999
Fault code
R7999
Firing rate
Stack Temperature controller Current temperature
Stack Temperature controller High/Low temperature alarm
Stack Temperature controller FGR permissive alarm
PID Load controller
Current water temperature
PID Load controller
Current steam pressure
PID Load controller
Low Fire Hold alarm
Feed Pump Level controller Current vessel level
Feed Pump Level controller High water alarm
Steam/Fuel Flow Monitor
Current steam flow
Steam/Fuel Flow Monitor
Current gas flow
Steam/Fuel Flow Monitor
Current fuel oil flow
Thermal Shock controller
Current water supply
temperature
Thermal Shock controller
Optimal temperature alarm
Table 4. Commissioning Overview.
Step
Action
Notes
1
On the Home page screen, press R7999 device icon.
2
On the Fuel/Air Ratio Control screen, select
Commission
, then
press "Do Commissioning" button.
3.a.
Enter R7999 Commission password.
The S7999D requires you to enter the R7999
Commission password. The factory default password
is “password”.
3.b.
Set new password for new R7999 (factory state).
4
On the Commission Configuration screen, perform the following
steps:
Summary of Contents for S7999D1048
Page 70: ...S7999D1048 COMBUSTION SYSTEM OPERATOR INTERFACE DISPLAY 65 0321 01 70 ...
Page 72: ...S7999D1048 COMBUSTION SYSTEM OPERATOR INTERFACE DISPLAY 65 0321 01 72 ...
Page 74: ...S7999D1048 COMBUSTION SYSTEM OPERATOR INTERFACE DISPLAY 65 0321 01 74 ...
Page 75: ...S7999D1048 COMBUSTION SYSTEM OPERATOR INTERFACE DISPLAY 75 65 0321 01 ...