R500
April 2017
Series 8 C300 Controller User's Guide
Honeywell
169
6. Load C300 Controller Configuration
6.4. Load With Contents command
Step
Action
Result
4
Once the load completes and the dialog
box closes, click the Monitoring tab.
CEE icon now appears in Monitoring tab.
The default state for a loaded CEE is
inactive/idle or color code blue.
5
to set the C300 to its Run state.
CEE icon turns green when active.
6
Repeat this procedure for other control
components as required.
Loading IOMs and CMs
Follow the initial load order guidelines in Table 3 to load these additional control
strategy components.
Before you load IOMs
, make sure that the I/O Modules are installed and capable of
communicating with the Server, otherwise errors will result. To Load IOMs, you
select the associated CEEC300 block and perform a '
.' Be sure
load check boxes for any CMs are
not
checked in the Load Dialog. You can also
load IOMs individually using the Load command; just be sure that the associated
IOLINK block is loaded first.
Load CMs and SCMs after other control strategy components are loaded
. To
Load CMs and SCMs, select the associated CEEC300 block and perform a '
.' Be sure only load check boxes for CMs and SCMs are checked.
Refer to the
Control Building User’s Guide
for more details about these procedures.