Appendix A - Installing RTP
Using an RTP to field wire the UIO
ATTENTION:
l
The maximum current load on RTP cable series 900RTC-L12xx is 2.8A
and 900RTC-H12xx is 4.2A per module for UIO.
l
RTP and cables are intended for permanent installation within their own
enclosure.
l
The RTP combines the two groups of 8 (RTP side) inputs into one group
of 16 (UIO side).
l
For digital output, up to 4 A is limited at module level and for each
channel 500 mA.
To wire the UIO using an RTP:
1. Mount the RTP cable assembly to ControlEdge 900 Controller. See the
following figure for the example installation diagram.
a. Remove the relevant key tabs from the terminal block to allow connection
with the module.
189
Summary of Contents for ControlEdge 900 platform
Page 6: ...6 Contents ...
Page 12: ...12 Chapter 1 About this guide ...
Page 52: ...52 ...
Page 57: ...57 One Slot Rack 1 CPM 1 EPM 1 P S 1 RM ...
Page 59: ...59 One Slot Rack ...
Page 62: ...Figure 5 7 Rack dimensions with redundant power supply 62 ...
Page 75: ...75 c Insert the Ethernet cables and mount the security cover for the EMP ...
Page 76: ...d Optional mount a wire security seal The user should get a wire security seal themselves 76 ...
Page 124: ...Figure 5 31 Universal Analog Input Wiring Figure 5 32 Examples of RTD Input Wiring 124 ...
Page 137: ...137 Figure 5 47 Pulse Outing Wiring Figure 5 48 Frequency Wiring ...
Page 144: ...Figure 5 57 16 point High Level Analog Input Wiring 144 ...
Page 147: ...147 Figure 5 60 AC DC Isolated Input Module Wiring ...
Page 148: ...148 ...
Page 168: ...168 ...
Page 178: ...178 Chapter 8 Diagnostics and Troubleshooting ...
Page 222: ...Appendix A Installing RTP 222 ...
Page 227: ...Appendix A Installing RTP Relay Output RTP Internal schematic 227 ...