29
SMB System C
Handling
Safety post without holder
1. Set the Steel Mesh Barrier on to
the Safety Post by positioning the
cranked top section of the Steel
Mesh Barrier over the top of the
Safety Post.
2. Plan the overlap. If one or more
of the Steel Mesh Barriers will
need to be removed, for example to
permit delivery of materials, these
barriers should be fitted last with
the overlaps on top at both ends.
3. Join the Steel Mesh Barriers by
overlapping them on the Safety
Posts. Also, adjust the length of the
Steel Mesh Barrier in the same way.
Join the Steel Mesh Barrier Stairs
by overlapping them, next to each
other, in the bracket.
4. For increased stability use
barrier clip reff. Barrier Clip 3220
1974_254
R
R