26
Handling
SMB System C
2. Set the Steel Mesh Barrier Holder
at a suitable height. The top edge of
the sleeve should be 1150 mm above
the lower edge of the Steel Mesh
Barrier.
The distance (D) varies between the
Sleeve and the lower section of the
Steel Mesh Barrier or Steel Mesh
Barrier Stair depending on the slope
of the staircase and where on the
step the Safety Post is positioned.
3. The hooks on the Steel Mesh Barrier
Holder are to be at right angles to the
Cloxy.
4. Tighten the Steel Mesh Barrier
Holder’s lock screw to minimum 50
Nm.
VIEW MAIN DIMENSIONS ( 1 : 10 )
ISOMETRIC VIEW ( 1 : 10 )
VIEW C/C SYSTEM S ( 1 : 10 )
VIEW 1140 POST SYSTEM S ( 1 : 10 )
A ( 1 : 10 )
STRAP
VIEW 1102 POST SYSTEM S ( 1 : 10 )
VIEW SMB STAIR PACKING ( 1 :10 )
VIEW ISO SMB STAIR PACKING ( 1 :10 )
VIEW BOARD SMB STAIR PACKING ( 1 :10 )
VIEW C/C SYSTEM C ( 1 : 10 )
VIEW POST SYSTEM C ( 1 : 10 )
A
30
°
196
2
55 120
10
44
16
0
Dimensions at 30
stair
angle
C/C
D
Strap 100335
65
5
750
20
15
Board
C/C
D
90°
4140_00
2