
CGW-MB Installation and Users’ Manual | P/N:LS10248-000HW-E | REV.G | JUL/31/2022
184
VESDA® Detectors
Connecting to the Panels
C.14 VESDA® Detectors
C.14.1 Connection Options
The CLSS Gateway mainboard operates with VESDA detectors and sends alarm data to
users.
Minimum Required Versions
For VESDA-E: All VESDA-E detector versions
For Android App: 1.0.0.2493 (2493)
For iOS App: 0.3.0 (1124)
For the CGW-MB: 3.0.4.70
C.14.2 To Use an Ethernet Connection
Using an Ethernet cable the CGW-MB and the VESDA detectors are connected.
Before Connecting
1. In the Configuration Computer
1. Install the VSC Tool (with a valid license) on the Configuration Computer.
2. Connect the USB ports of the Configuration Computer and the detector with a
Type B cable.
2. In the detector:
• Using the VSC Tool, configure the respective parameters, including the
authentication password.
• Using the VSC Tool, create a connection profile for Ethernet.
• If detector connector is used, ensure that the detectors are connected with the
detector connector.
3. In the CGW-MB: Ensure that the CLSS Gateway mainboard is connected with
CLSS
Site Manager
via Ethernet or Wireless.
1. On the CLSS Gateway mainboard Side
Connect the Ethernet cable to the Ethernet port 2 of the CLSS Gateway mainboard.
Refer to
where it is labeled as the Ethernet Port 2. It is the J3 pin on the
CLSS Gateway mainboard board.
2. On the Detector Side
Connect the Ethernet cable to the Ethernet port of the detector.
3. Power Connection
The CLSS Gateway mainboard can receive the 24V DC power from an external power
supply.
On the CLSS Gateway mainboard Side
• Connect the Red wire to the +ve pin of the power supply port.
• Connect the Black wire to the -ve pin of the power supply port.
NOTE:
The CGW-MB can connect with a VESDA detector or a VESDA Detector Connector.
NOTE:
The detector’s power supply to the CLSS Gateway mainboard must be 24V
DC power.
!
WARNING: ENSURE THAT THE BATTERY BACKUP CAPACITY OF A CONNECTED SMOKE DETECTOR IS
CORRECTLY CALCULATED. POWER THAT THE CLSS GATEWAY MAINBOARD ALSO WOULD CONSUME
SHOULD BE CONSIDERED IN THE CALCULATION.