
FALCON
USER GUIDE
EN2Z-0962GE51 R0715
170
Calendars
Please refer also to the "Time Programs" section, p. 113.
Calendars are assigned to a whole project. They contain exception days or periods,
e.g. Christmas, holidays. If controller schedules refer to the same calendar(s),
project wide scheduling is possible for these controllers; this is because calendar
dates are executed in each controller of the project, which has references to the
calendar. Changes in multiple particular controller schedules can be quickly made
by simply changing the referenced calendar(s).
View Calendars
Procedure
1.
In the tree, expand the
Advanced
item and click on Calendars.
RESULT: On the right, the
Calendars
tab displays showing all existing
calendars.
All changes done to a calendar on this controller level will be synchronized with
all other controllers of the same project.
For each calendar the following properties are shown:
•
Calendar Name
•
Description
Summary of Contents for Centraline FALCON
Page 1: ...FALCON User Guide Copyright 2015 Honeywell GmbH All Rights Reserved EN2Z 0962GE51 R0715 ...
Page 2: ...FALCON USER GUIDE EN2Z 0962GE51 R0715 ...
Page 4: ...FALCON USER GUIDE EN2Z 0962GE51 R0715 4 ...
Page 9: ......
Page 11: ...USER GUIDE FALCON EN2Z 0962GE51 R0715 7 ...
Page 12: ...FALCON USER GUIDE EN2B 0962GE51 R0715 8 ...
Page 77: ...USER GUIDE FALCON 73 EN2Z 0962GE51 R0715 ...
Page 113: ...USER GUIDE FALCON 109 EN2Z 0962GE51 R0715 Fig 26 Alarm behavior of pulse converter datapoint ...