AS302P
S
INGLE
P
HASE
MART
M
ETER
O
PERATING
I
NSTRUCTIONS
M450
001
1D
23
RD
AY
2019
Page 1: ...AS302P SINGLE PHASE SMART METER OPERATING INSTRUCTIONS M450 001 1D 23RD MAY 2019 ...
Page 2: ...d transmitted transcribed stored in any retrieval system or translated into any language by any means electronic or mechanical including photocopying and recording for any purpose other than the licensee s personal use without the express written permission of Honeywell In no event will Honeywell be responsible for any damages including any lost profits lost savings or other incidental or conseque...
Page 3: ...ention and use of the named addressee s It must not be disclosed to any person without our authority If you are not the intended recipient please delete it from your system immediately any disclosure copying or distribution thereof or any action taken or omitted to be taken in reliance thereon is prohibited and may be unlawful ...
Page 4: ......
Page 5: ...FF 15 11 1 Deferred Pending Tariff 15 11 2 Tariff Structure 15 11 2 1 TOU Mode 15 11 2 2 Tariff Switching Table 16 11 2 3 Seasons 16 11 2 4 Week Profile 16 11 2 5 Day Profiles 17 11 2 6 Special Days 17 11 2 7 TOU Price Matrix 17 11 2 8 Standing Charge 17 11 3 TOU Block Tariff 17 11 3 1 TOU Block Price Matrix 18 11 3 2 Maximum Demands 18 12 BILLING DATA 20 12 1 1 Periodic Calendar Billing Data Log ...
Page 6: ... 29 19 DISPLAY AND PUSHBUTTONS 30 19 1 Introduction 30 19 2 Display Resolution 30 19 2 1 Dial Test 30 19 3 Display Modes 30 19 3 1 Scroll Mode 31 19 3 2 Menu Mode 31 19 3 3 Auto Configuration of Active TOU Registers 31 19 4 Displayable Data 31 19 5 Display Configuration 32 19 6 Display Backlight 32 19 7 Display Indicators 33 19 8 Display Function Triggers 33 19 9 Privacy Customer PIN 33 20 POWER Q...
Page 7: ... 46 28 4 Event and Alert Filters 46 29 TECHNICAL DATA 47 29 1 AS302P Meter 47 29 2 Contactor 48 30 INSTALLATION COMMISSIONING AND DECOMMISIONING 49 30 1 HAN Setup 49 30 2 Meter Commissioning 49 30 3 Meter Installation Temp No WAN 50 30 4 Meter Decommissioning 50 31 INSTALLATION AND COMMISSIONING OF HARDWARE 51 31 1 Unpacking 51 31 2 Handling 51 31 3 Storage 51 31 4 Installation Site 51 31 5 Electr...
Page 8: ...mart Meter ____________________________________________________________________ Honeywell M450 001 1D 23 05 2019 35 2 APPENDIX B Event Alarm Logs 71 35 3 APPENDIX C Interface Commands 75 35 4 APPENDIX D Data 77 36 GLOSSARY 80 ...
Page 9: ...sonably practicable the Health Safety and Welfare at Work of all their employees Employers must therefore ensure that employees are informed trained and supervised and use proper working procedures to ensure the safety of themselves and others The information provided in this manual is intended to ensure that products are properly installed and otherwise handled in order to maintain them in a safe...
Page 10: ...nt legislation Lithium batteries require careful disposal Before arranging for the disposal of these cells users should satisfy themselves that the proposed means of disposal is both safe and compliant with local legislation requirements Honeywell would like to draw the user s attention to the International Standard for Lithium Batteries IEC 60086 4 which gives further information about the handli...
Page 11: ... 2002 95 EC and 2011 65 EU Restriction of the use of certain hazardous substances in electrical and electronic equipment RoHS EN 62052 11 2003 Electricity Metering Equipment a c General requirements tests and test conditions Metering equipment EN 62052 31 2016 Electricity Metering Equipment ac General Requirements Test and test conditions Part 31 Product Safety Requirements EN 62053 21 2003 Electr...
Page 12: ... the 2 4 GHz ISM band and using wide band modulation techniques Harmonized Standard covering the essential requirements of article 3 2 of Directive 2014 53 EU IEEE 802 15 4g 2012 IEEE Standard for Local and Metropolitan Area Networks Part 15 4 Low Rate Wireless Personal Area Networks LR WPANs Amendment 3 Physical Layer PHY Specifications for Low Data Rate Wireless Smart Metering Utility Networks S...
Page 13: ... and to provide Customer Information for use with Type 1 or Type 2 Devices The meter provides extensive security features in line with CPA Requirements The meter contains a contactor thus allowing the meter to be used in Prepayment Mode Load Limiting functionality and also allows Disconnection of Supply if premises are not occupied The display sequence is supported by two modes of operation Scroll...
Page 14: ...ks Import kWh Menu Driven Flexible Display 2 Pushbuttons DLMS Protocol ZigBee Interface Firmware Download Load Profiling Instrumentation Power Quality Monitoring Extensive Security Data Historic Billing Information Daily Weekly Monthly Customer Data Load Limit functionality Comms Hub Modular Interface 2A Auxiliary Relay Optional IP53 Protection Tariff Structure 48 TOU Import kWh 8 TOU x 4 Blocks I...
Page 15: ...le Reference voltage 230V Frequency 50 Hz Current MID ratings Imin Iref Imax 1 0 20 100 A 0 5 10 100 A 0 25 5 100 A Current IEC ratings Ib Imax 20 100A 10 100A 5 100A 6 2 Terminal Arrangements Current Terminals 8 2mm diameter bore 2 x M6 Combi pinch screws Screw material Steel Zinc Chromate plated Auxiliary Terminals Relay Screw Terminals See 34 4 6 3 Energy Measurement The meter measures the foll...
Page 16: ...ctronically detect if the Comms Hub is present or not The Removal of a Comms Hub event is stored in the Security Log with a Time and Date Stamp Magnetic Field Detection The AS302P has a sensor which detects if a Strong Magnetic Field has been detected or removed The detection or removal of a Magnetic Field is logged in the Security Log with a Time and Date Stamp Detection Level of a Magnetic Field...
Page 17: ...Time and Date Stamp Constant Data See Appendix D for details configured during manufacture and can be read by the DCC at any time Internal Data See Appendix D for details this data is not available outside the meter 8 1 Registration of Quantities kWh Active Energy kWh Import A kWh Export A kvarh Reactive Energy kvarh Import Reactive R kvarh Export Reactive R kvarh is derived using the phase shift ...
Page 18: ...ment Mode to Prepayment is used to switch the Meter to Prepayment mode On using this use case the following parameters are configured in the meter New account in Prepayment mode Disablement threshold Suspend Debt Disabled and Suspend Debt Emergency Activation time for the new account Disablement Threshold and Suspend Debt Disabled Emergency parameters GBCS Use Case ECS02 Set ESME Payment Mode to C...
Page 19: ...set in the meter will continue to be used until the newly downloaded tariff is activated Each of these items can have their own Activation Date Time If an Activation Date Time is set in the past this will be actioned immediately It is possible for an Activation Date Time to be set significantly far enough in the future so that any new tariff element will never be activated A Cancellation Command c...
Page 20: ...he Tariff supports a maximum of 200 Switching Points These can be used in any combination over the maximum number of Seasons Week Day Profiles given below 11 2 3 Seasons Up to 4 Seasons may be specified and at least one Season must be programmed for the TOU Registers to be available The old Season ends at the instant the new Season starts A new Season starts at 00 00 of the specified date Start da...
Page 21: ...o used for the Prepayment Application and to calculate Cost Information The AS302P contains the Active and a Deferred Price Matrix which must be configured for each TOU Rate The Price Matrix is for Import Active Energy only The Price Matrix applies to all 48 TOU Registers i e they all need to be sent at the same time it is not possible to update a single TOU Price The Price Matrix for future cost ...
Page 22: ...riff The Tariff Block Register Counters rising will be reset in line with the Billing Calendar these can also be reset on receipt of a command 11 3 1 TOU Block Price Matrix The TOU Block Price Matrix is for Import Active Energy only and contains 8 x 4 prices The TOU Block Price Matrix can be programmed to be activated at a specified Activation Date Time The TOU Block Price Matrix for the TOU Block...
Page 23: ... reset along with its UTC Time of Occurrence 11 3 2 2 Maximum Demand Configurable Time Active Power Import Value This stores the largest Average Value of Active Power Import Recorded in any 30 Minute Period within a Configurable Time Period since it was last reset along with its UTC Time of Occurrence 11 3 2 3 Maximum Demand Active Power Export Value This stores the largest Average Value of Active...
Page 24: ...atic Billing will occur The following Billing Data is available in the Billing Data Log Credit Mode Tariff TOU Registers Tariff TOU Block Registers Active Import Register Prepayment Mode Credit Information above Meter Balance Emergency Credit Balance Accumulated Debt Remaining Payment Debt Remaining Time Debt 1 and 2 An Alert is sent via the HAN Interface containing the most recent entries in the ...
Page 25: ...n Billing Payment Based Debt is recovered The last 10 Payment Based Debt Payments 12 2 Daily Read Billing Data Logs The meter stores 3 Daily Read Data Logs These are stored with a UTC Date and Time Stamp 31 sets of data are stored for each of the 3 logs 12 2 1 Import Daily Read log Tariff TOU Register Matrix Tariff TOU Block Register Matrix Active Import Register 12 2 2 Export Daily Read Log Activ...
Page 26: ...y of Month 13 2 Meter Balance Credit Mode Meter Balance can be viewed on the display The Meter Balance is calculated using the following factors Energy usage Price applicable at the time based on TOU Rate or TOU Block Rate Standing Charge If the meter is Powered Down for a Period then all missed Standing Charges will be added when the meter is next powered up The Meter Balance is updated every sec...
Page 27: ...sumed in the 30min Period 13 Months of Data for One Channel for 30min 16 2 Profile 2 Profile Data Log Export kWh Export amount of energy consumed in the 30min Period kvarh Export amount of energy consumed in the 30min Period 3 Months Days of data 30 minutes period 16 3 Profile 3 Profile Data Log kvarh Import kvarh Import amount of energy consumed in the 30min Period 3 Months Days of Data 30 Minute...
Page 28: ... display 17 2 1 Low Credit Warning The Low Credit Threshold is a configurable monetary value that is used to alert the consumer that the Meter Balance and if activated the Emergency Credit Balance is low The meter issues a Low Credit Warning on the display to the consumer if the Meter Balance and if activated the Emergency Credit Balance is equal to or less than the Low Credit Threshold and sends ...
Page 29: ...s are made See Section Allocation for Credit Top Up if the Meter Balance rises above the Disablement Threshold then the Contactor will be Armed the contactor symbol will flash An Alert will be sent on the HAN Interface indicating the Contactor is Armed On successful application of an Addition of Credit the Billing Data Log will be updated and an Alert containing a UTC Date and Time stamped Meter B...
Page 30: ...round back to 0 The character currently selected will flash until the SELECT button is pressed Once a code has been selected the cursor will move to the right immediately to enable the next character selection If the UTRN code validation is successful the meter shows the following message TopUp Accepted If the UTRN code validation is unsuccessful the meter shows the following message TopUp Rejecte...
Page 31: ...g the Top Pushbutton Emergency Credit is accepted by use of the PPMID A Command to activate Emergency Credit this will be rejected if the meter is in Credit Mode The meter changes the Emergency Credit Status to Accepted If the contactor is open and if the combined credit of the Meter Balance and the Emergency Credit Balance rises above the Disablement Threshold then the contactor will be armed unl...
Page 32: ...lected daily and there has been a Power Outage for 3 days then 3 00 will be recovered at power restoration If the Daily Recovery Rate is greater than the amount of Debt Outstanding then the Debt Outstanding will reduce to zero and the difference between DRR and DO will remain on the Meter Balance 17 7 2 Payment Based Debt 3 A Payment Based Debt can be collected by the meter when credit is added to...
Page 33: ...bt that should have been collected during the suspension period will be stored in the Accumulated Debt Register Standing Charge and Debt collection is suspended if the Emergency Credit Status is in use and the Suspend Debt Emergency Parameter has been set to On Standing Charge and Debt Collection is not suspended if the Emergency Credit Status is in use and the Suspend Debt Emergency Parameter has...
Page 34: ...Display Resolution is included in the Table in 34 6 19 2 1 Dial Test Dial Test is fixed to 5 Digits plus 3 Decimal Places The following Cumulative Registers are displayed Import kWh xxxxx xxx will always be available as MID Requirement Export kWh xxxxx xxx Import kvarh xxxxx xxx Export kvarh xxxxx xxx The displays are accessible from the Utility Menu 19 3 Display Modes The display has the followin...
Page 35: ...ral Registers Account Historical Utility Logs Engineering 19 3 3 Auto Configuration of Active TOU Registers The meter can be configured to automatically display Active TOU kWh Registers in Scroll and Menu Mode Display Sequences This feature allows tariffs to be changed without reconfiguring the display 19 4 Displayable Data A full list of Displayable Data Items is given in 34 6 The Main Displays a...
Page 36: ... shown with either a or Euro symbol PIN items which have this identification have the option of only being viewed when a Privacy Customer PIN is entered See Section 19 9 19 5 Display Configuration Displays can only be configured during the Manufacturing Process Any items can be configured to be available in the Scroll Sequence In Menu Mode all items are available to be displayed but the Supplier c...
Page 37: ...exceeds Low Credit Warning Threshold or button is pressed Load Limit Indication that the Load Limit Threshold has been exceeded for a configurable length of time 19 9 Privacy Customer PIN Privacy Customer PIN Protection enables access to certain displays functions via the display pushbuttons Access to these PIN protected displays can be gained by Input of a number 4 digits that matches the Privacy...
Page 38: ...a period where an event was not detected If an Event is created the meter will Create an Event with UTC Time Date Stamp in the Power Event Log Generate and Send an Alert via the HAN When the average returns inside the threshold the meter will Create an Event with UTC Time Date Stamp in the Power Event Log Generate and Send an Alert via the HAN In addition the Average RMS Over and Under Voltage has...
Page 39: ...rt Metering Home Area Network which Operates within the 2400 2483 5 MHz Harmonised Frequency Band Supports the Communications Links as follows Link to a Communications Hub Communications Link with Type 1 Devices Type 2 Devices Support Security Credentials for each device Add Security Credentials for Type 1 and Type 2 Device Credentials are stored in a Device Log These will be verified Command and ...
Page 40: ... Responses Send Commands Send Information Send Alerts The Commands that are support to DCC are given in Appendix C 21 5 Communications with Type 1 Devices The meter is capable of supporting seven communication links with Type 1 Devices of which five are reserved for HCALCS For each Type 1 Device the meter can Receive Commands Send Responses Send Commands Send Information Send Alerts The Data that ...
Page 41: ...allowed The Firmware must be verified for Authenticity and Integrity before it is allowed to run on the meter Distribution Receipt Alerts identifying success or failure are provided Also an event is created in the Security Log New images can be activated by a Firmware Activation Command The Firmware Image is verified before being activated The Firmware includes a Version Number which once activate...
Page 42: ...he active Firmware Version 22 3 4 Restrictions If the verification fails then the New Image cannot be activated The AS302P can only have one Active Image and only one Image that is pending for activation The AS302P allows a New Image to be downloaded at any time The AS302P verifies its Firmware at every Power On to check that it is the same as the last Verified and Running Firmware If the verifica...
Page 43: ...iliary Load Control Switches ALCS or HAN Auxiliary Load Control Load Switches HCALCS A single On board Auxiliary Relay can be supplied as an option This relay is rated at 230V 2A The internal Auxiliary Load Control Switch will always be defined as Switch 1 it is not possible to reconfigure this from DCC Any calendar or commands intended for the internal switch need to be configured for and sent to...
Page 44: ... is the product of the following numbers rounded to the nearest second Randomisation Offset Number this is a number between 0 1 generated automatically during the manufacturing process Randomisation Offset Limit this is a configurable value between 0 and 1799 24 3 Auxiliary Load Control Commands The following Commands are available to control the state of the ALCS HCALCS All Commands can be set to...
Page 45: ...finishes at 8 00 While Boost functionality is active there will be 2 displays added to the General Display Menu Activate Boost Choose one of the available periods 15 30 45 or 60 Use NEXT button to navigate between options Use Long press on SELECT button to active a boost period After the Boost period is activated the meter will display a message Activate with XX min Extend Boost Choose one of the ...
Page 46: ...ill be Locked If A Disable Command is received from the DCC A Tamper Event is detected and the meter is configured to Disable the Supply If the Contactor is in a Locked state Contactor Open and Supply Disabled this will be shown on the display It can only be re enabled by a Command from the DCC to either Arm or Enable the Supply Once the Arm Command is received then the meter changes the state fro...
Page 47: ...acy of better than 0 5 of a second per day at reference temperature In the event of a Supply Failure a Backup Battery supports the Crystal Oscillator In the absence of Mains Voltage the meter maintains Date and Time for a period exceeding two years The Internal Clock meets the requirements of BS EN 62054 21 26 1 Local Time The meter display shows Local Time The meter provides 2 Daylight Savings Da...
Page 48: ...que to that Meter therefore will not be on any other Meter so a Breach of Security on a Single Device will not affect any other Meter in the population The Meter securely stores the Private Keys and has the capability of formatting and sending via its HAN Interface a Certificate Signing Request containing the corresponding Public Key and Meter Identifier A Command from the DCC will be received to ...
Page 49: ... what might be expected e g the cumulative Import kWh increments on each successive read 27 4 Physical Security The Meter maintains a Secure Perimeter through its Case Design Where access to the Meter is necessary a cover is provided which attaches to the meter using a Traditional Seal Each area that requires a Cover to be fitted is equipped with a switch that detects when the cover has been remov...
Page 50: ...nd Time Stamp 28 1 Security Log This Log Holds 100 Events in a FIFO structure Cannot be Cleared Stores Sensitive Events 28 2 Event Log This Log Holds 100 Events in a FIFO structure Can be Cleared by a Command an entry will be raised in the Security Log when this occurs 28 3 Power Event Log This Log Holds 100 Events in a FIFO structure Cannot be Cleared 28 4 Event and Alert Filters The Meter Functi...
Page 51: ...Max 0 8W Average 4W under normal operating conditions 0 02VA Display Viewing Angles High Contrast 2 Line Display Vertical 10 above 40 below the horizontal Horizontal 30 either side of vertical Meter Constant pulsing LED output Pulse Width 4000 Pulses kWh kvarh Wavelength 640nm 5 ms Auxiliary Relay 230V 2A a c Product Design Life Service Design Life 20 years 15 years Temperature Humidity Specified ...
Page 52: ... Contact Data Contact Arrangement Maximum Switching Power Maximum Switching Voltage Maximum Switching Current Mechanical Life Single Pole Magnetically Latched Bi stable 27 700 VA 440 VAC 100A 10 000 Operations BS EN 62055 31 Annex C Standards Short Circuit Withstand Overcurrent Withstand BS EN 62055 31 UC3 BS 7856 2013 120A Continuous 145A for 2 Hours ...
Page 53: ...t of such a Request instructs the Comms Hub to 1 Add the Devices to the Comms Hub Device Log 2 Allow joining set the Comms Hub to pairing mode 7 HES instructs Comms Hub to allow HAN Device Joining for Fixed Time Period Comms Hub is set to Pairing Mode for a minimum of 3600 seconds 1 hour 8 Comms Hub successfully creates HAN 9 Installer advised that meters can be joined to HAN and initiates Meter J...
Page 54: ...is via DCC back to Supplier to a HHT to the Comms Hub with the following observations HHT Process to Connect to the Comms Hub is still not confirmed via GBCS Change and TBDG HHT needs a robust connection to Suppliers Systems to make the Installation Viable due to sequencing of Commands and Responses The AS302P is likely to remain on its Own Time from factory but identified in GBCS terms as Unrelia...
Page 55: ...al vibration Care should be taken to avoid marking or scratching the meter case and polycarbonate cover 31 3 Storage If the meter is not required for immediate use it should be returned to the original packing and stored in a clean dry environment Storage temperature 25 C to 70 C 31 4 Installation Site Read the Warning Transferring Meters from Cold to Humid Conditions in Section 2 The installation...
Page 56: ...er Fix a 5mm dia x 13mm long round headed screw into the meter board to accommodate the keyhole fixing aperture at the back of the meter Leave the shank of the screw projecting from the board by 4 5 mm Hang the meter on the screw and align it to be vertical Secure the lower end of the meter to the board using two 5mm dia x 13mm long round head screws through the lower mounting holes in the area of...
Page 57: ...akes contact with the skin it must be washed off immediately with water Seek medical advice Recycling Materials The following meter materials are recyclable polycarbonates metals and printed circuit board See Safety Warning in Section 2 Major plastic parts are marked with recycling information On the disposal of a meter every endeavour should be made to comply with local environmental legislation ...
Page 58: ...___________________________________________________________ Honeywell M450 001 1D 23 05 2019 34 FIGURES TABLES 34 1 Sample Model Code Pulse Output Values For all meter ratings the normal pulse value for the Test LED will be 4000 pulses kWh kvarh ...
Page 59: ...Operating Maintenance Instructions 55 __________________________________________________________________________ Honeywell M450 001 1D 23 05 2019 34 2 AS302P Front View ...
Page 60: ... Single Phase Smart Meter ____________________________________________________________________ Honeywell M450 001 1D 23 05 2019 34 3 AS302P Example Nameplate Note The Nameplate will be laser printed on the cover ...
Page 61: ...Operating Maintenance Instructions 57 __________________________________________________________________________ Honeywell M450 001 1D 23 05 2019 34 4 Terminal arrangements wiring diagram ...
Page 62: ...58 AS302P Single Phase Smart Meter ____________________________________________________________________ Honeywell M450 001 1D 23 05 2019 34 5 Dimensions and Fixing Centres ...
Page 63: ...ed before its content x x Debt to Clear Acc Debt Acc Debt x Time D1 val Remaining Amount 0 00 x Time D1 DRR Rate 0 00 x Time D2 val Remaining Amount 0 00 x Time D2 DRR Rate 0 00 x Prep D val Remaining Amount 0 00 x Prep D RR Percentage 0 00 x Prep D Cap Max collected for Payment Based Debt 0 00 x Info Will display PIN Code entry display for validation if configured before its content x x Low Credi...
Page 64: ...show Act on display Rates 1 48 TOU Import Active Energy 00000 0 kWh T T T Block Rate in Use If R1 R4 is active in the tariff these show in the menu item Imp RxBy T Tariff Register for Time of Use with Block Pricing 0000 0 kWh T T T Block Rate All Imp RxBy T Tariff Register for Time of Use with Block Pricing 0000 0 kWh B B B Block Rate Counter Imp RxBy R Block Counters for Block Pricing 0000 0 kWh ...
Page 65: ...xXXX MCOR CRC CAL 0xXXX ACOR CRC 0xXXXXXXXX Dial Test Cum Imp Act Cumulative Import Active Energy 00000 000 kWh Cum Exp Active Cumulative Export Active Energy 00000 000 kWh Cum Imp Reac Cumulative Import Reactive Energy 00000 000 kvarh Cum Exp Reac Cumulative Export Reactive Energy 00000 000 kvarh Inst Values Vrms Instantaneous Voltage 000 0 V Irms Instantaneous Current 0000 0 A Inst Act Pw Instan...
Page 66: ...D PAN ID XPAN ID EUID Signal ALCS 1 State Shows ALCS State Test Long Press on SELECT Button changes State of ALCS for 5 minutes ALCS 2 State Shows ALCS State Test Long Press on SELECT Button changes State of ALCS for 5 minutes ALCS 3 State Shows ALCS State Test Long Press on SELECT Button changes State of ALCS for 5 minutes ALCS 4 State Shows ALCS State Test Long Press on SELECT Button changes Sta...
Page 67: ...nfiguration Number non tariff features Device Identifier GUID Meter Variant A for single element meter Model Type 8 Characters Customer Identification Number octet sting 4 Supplier Serial Number 16 characters ASCII MPAN Import Octet string 26 using 13 for the first element MPAN MPAN Export Octet string 13 Firmware Details ACOR version Firmware Code Checksum Firmware Details MCOR version number Met...
Page 68: ...64 AS302P Single Phase Smart Meter ____________________________________________________________________ Honeywell M450 001 1D 23 05 2019 34 8 Order of Accounting ...
Page 69: ...ection Start Debt Collection Credit Received Calculate Debt Collection amount Using RPP Percentage Weekly RRC Reached Suspend Debt 3 Collection for the Rest of the Week Yes Yes No Weekly RRC Exceeded Collect Reduced Debt Payment Ensuring RRC is Not Exceeded Collect Debt Payment Update the Customer Account Record Update the Customer Account record End Debt Collection Yes No ...
Page 70: ...66 AS302P Single Phase Smart Meter ____________________________________________________________________ Honeywell M450 001 1D 23 05 2019 34 10 UTRN Processing ...
Page 71: ...EC threshold 6 Local or HAN TopUp accepted by the prepayment application takes the MB above equal to the EC threshold 7 The EC is all used 8 Meter balance adjustment received while EC is in use accepted by the prepayment application takes MB above Disablement Threshold 9 Local or HAN TopUp accepted by the prepayment application is sufficient to repay any EC owed where EC owed EC limit and take the...
Page 72: ...68 AS302P Single Phase Smart Meter ____________________________________________________________________ Honeywell M450 001 1D 23 05 2019 ...
Page 73: ...D Test Indicator The kWh if configured kvarh test indicator pulses for both import and export energy measurement 2 Comparing LED Pulses with Substandard Meter Register Advance What you will need Suitable test equipment with a sensor to detect LED pulses A suitable substandard meter A counter for counting the number of LED pulses Checking registration In order to achieve a repeatability of 0 1 the ...
Page 74: ...has the facility to calculate meter errors based on the pulse output from a substandard meter It will be necessary to set the pulse value of the meter under test shown on the meter nameplate into the meter test equipment The duration of each test must be at least 60 seconds The number of LED pulses should be greater than Itest Test current V System voltage PF Power factor of test load K LED pulse ...
Page 75: ...hold 0x8F47 Mandated N N Device joining failed 0x8F48 Mandated N N Device joining succeeded 0x8F49 Mandated N N Device Unjoining failed 0x8F4A Mandated N N Device Unjoining succeeded 0x8F4B Mandated N N Device s own Digital Signing Certificate replacement failed 0x8F4C Mandated N N Device s own Digital Signing Certificate replacement succeeded 0x8F4D Mandated N N Device s own Key Agreement Certifi...
Page 76: ...N User Interface Command Input and Successfully Actioned Boost 0x8161 Mandated N N User Interface Command Input but not Successfully Actioned Boost 0x8162 Mandated N N Future dated HAN Interface Command Successfully Actioned 0x8F66 Mandated Y 2 N Future dated HAN Interface Command not Successfully Actioned 0x8F67 Mandated Y 2 N Device joined SMHAN 0x8183 Mandated Y 1 N Tap Off Message Response or ...
Page 77: ...Threshold voltage rises above for longer than the configurable period 0x8020 Mandated Y 1 N RMS Voltage above Voltage Swell Threshold voltage rises above for longer than the configurable period 0x8024 Mandated Y 1 N RMS Voltage below Extreme Under Voltage Threshold voltage falls below for longer than the configurable period 0x8028 Mandated Y 1 N RMS Voltage below Voltage Sag Threshold voltage fall...
Page 78: ... Ok 0x8015 Non mandated Y 1 N Reverse Current 0x81BB Non mandated Y 1 N ALCS Event Log Event Alert Code Meaning Event Alert Code Mandated Non mandated Alert WAN Alert Type Alert HAN Failure of Ad hoc Change to HAN connected Auxiliary Load Control switch 0x811A Mandated N N Failure of Calendar Based Change to HAN connected Auxiliary Load Control switch 0x811B Mandated N N Successful Ad hoc Change t...
Page 79: ...og Clear Entries Auxiliary Load Control Switch Event Log Y Clear Event Log Clear Event Log Entries Y Disable Privacy PIN Protection Disable Privacy PIN Protection Y Enable Supply Enable Supply if Supply Armed Y Issue Device Security Credentials Generate Public Private Key Pair Y PPMID Enable Supply PPMID enable Supply Y Read Configuration Data Read Value of Constant Data Items Y Read Operational D...
Page 80: ...ock Set the Clock Via the HAN Y Set HAN Connected Auxiliary Load Control Switch state Issue an Auxiliary Load Control Switch Command Y Set Payment Mode Set Prepay or Credit Mode Set Tariff Accept New Tariff Values Y HAN Interface Commands Issued by AS302P Control HAN Connected Auxiliary Load Control Switch Open Close Auxiliary Load Control switch for Specified Time Y ...
Page 81: ...capable of storing one hundred UTC date and time stamped entries of non security related information Firmware Version The active version of Firmware of meter Load Limit Counter The number of times the Active Power Import has exceeded the Load Limit Period Load Limit Power threshold Maximum Demand Active Power Import Value A store capable of holding the largest average value of Active Power Import ...
Page 82: ... Under Voltage Threshold The average RMS voltage below which an under voltage condition is reported Average RMS Voltage Measurement Period The length of time in seconds over which the RMS voltage is averaged Billing Calendar A calendar defining billing dates for the storage of billing related information Contact Details The name and contact telephone number of the Supplier Currency Units The Curre...
Page 83: ...Period Duration in seconds used to measure an extreme over voltage condition RMS Extreme Over Voltage Threshold RMS voltage above which an extreme over voltage condition is reported RMS Extreme Under Voltage Measurement Period RMS Extreme Under Voltage Measurement Period RMS Extreme Under Voltage Threshold RMS voltage below which an extreme under voltage condition is reported RMS Voltage Sag Measu...
Page 84: ...ood at a glance Arm To establish a state whereby Supply will be Enabled in response to a Command to Enable Supply Armed and Arming shall be construed accordingly Authentication The method used to confirm the identity of entities or Devices wishing to communicate and Authenticated and Authenticity shall be construed accordingly Authorisation The process of granting access to a resource and Authoris...
Page 85: ...hnical Specifications CHTS The document designated by the Secretary of State to describe the minimum capabilities of communications hubs Communications Link The exchange of Commands Responses Alerts and other information between a system or Device and another system or Device which is independent of the transport mechanism used Confidentiality The state of information in transit or at rest where t...
Page 86: ...thin the day For the purposes of Non Disablement Periods the rules defined in a Switching Table specifying the times during the day when a Non Disablement Period is active DCC Data Communications Company Debt Register Storage for recording an amount of debt to be recovered Debt to Clear The amount of credit the consumer needs to add to ESME or GSME to cause the Meter Balance to rise to the disable...
Page 87: ...Electricity Smart Metering Equipment Export The flow of electricity out of the Premises and like terms shall be construed accordingly Firmware The embedded software programmes and or data structures that control Devices Great Britain Companion Specification The document forming part of the Smart Energy Code describing nature of Communications Links that ESME GSME HCALCS IHD and PPMID must be capab...
Page 88: ... Command to Arm or Enable the Supply Locked and Locking shall be construed accordingly Message Authentication The process by which the receiver of a message is provided with assurance that the sender is who they claim to be and that the message is in the form originally sent MPAN Meter Point Administration Number MPRN Meter Point Reference Number Non Disablement Period A period of time during whic...
Page 89: ... Key The Key in a Public Private Key Pair which can be distributed to other parties Public Private Key Pair Two mathematically related numbers that are used in Cryptographic Algorithms Random Number Generator A component used to generate a sequence of numbers or symbols that lack any predictable pattern Reactive Energy The integral with respect to time of Reactive Power in units of volt amperes re...
Page 90: ...Smart Metering Wide Area Network A communications network allowing the exchange of information between Devices and the Utility Special Day A day defined in a Switching Table where allocation to Tariff Registers setting the commanded state of Auxiliary Load Control Switches or HAN Connected Auxiliary Load Control Switches or specifying Non Disablement Periods is based on a specified Day Profile Sup...
Page 91: ...vice that does not store or use the Security Credentials of other Devices for the purposes of communicating with them via its HAN Interface Unauthorised Physical Access Unauthorised access to the internal components of GSME ESME or the PPMID through its Secure Perimeter Unique Transaction Reference Number UTRN A truncated PTUT Unlocked To establish a state whereby the state of the Supply is determ...
Page 92: ...well com www elster com Elster is a registered trade mark of Honeywell International Inc 2019 Honeywell International Inc All rights reserved The company s policy is one of continuous product improvement and the right is reserved to modify the specifications contained herein without notice These products have been manufactured with current technology and in accordance with applicable Standards ...