AD1200-CT
Three Phase DIN-RAIL Meter
Product Manual
Page 1: ...AD1200 CT Three Phase DIN RAIL Meter Product Manual ...
Page 2: ...Characteristics 2 3 Basic Parameters 3 4 Mechanical Construction 4 4 1 Outline Dimensions 4 4 2 Connection Diagram 4 5 Meter functions 4 5 1 Communication 4 5 2 Button 4 5 3 Backlight 5 5 4 Pulse output 5 5 5 LCD display content 5 5 5 1 Parameters show on the LCD screen 5 5 6 System parameters address 8 6 Installation Instruction 11 6 1 Installation instructions 11 6 2 Installation instruction det...
Page 3: ...nnect 50 6 0Hz 1200 0 Activ e Cl 1 2 2 Standards and References The AD1200 meets and operates in accordance with the following Standards IEC 62052 11 2003 Electricity metering equipment a c General requirements tests and test conditions Part 11 Metering equipment IEC 62053 21 2003 Electricity metering equipment a c Particular requirements Part 21 Static meters for active energy classes 1 and 2 2 3...
Page 4: ...minal Frequency fn 50Hz Starting Current 0 2 In Meter Constant 12000 imp kWh Start up Time 5s Power Consumption Voltage circuit 1W 8VA Current circuit at Ib 4VA Operating Voltage Range Nominal Operating Voltage 0 9Un 1 1 Un Extended Operating Voltage 0 8Un 1 15 Un Specified operating temperature range 20 70 Limit operating temperature range 25 70 Limit Storage and transportation temperature range ...
Page 5: ...upports both IR near infrared and RS485 communication IR complies with EN62056 IEC1107 protocol and RS485 communication use the MODBUS protocol 5 2 Button The meter has two buttons which can be display all the contents by pressing the buttons The CT ratio LCD scroll display time reset the energy and backlight mode can be set by the buttons on the screen ...
Page 6: ...12 total four pulse output modes by communication 5 5 LCD display content 5 5 1 Parameters show on the LCD screen reverse indicate if shows the reverse power then display the REV total kWh indicate if shows the total kWh and total tariff kWh then display this sign content indicate it can be shown T1 and T2 L1 and L2 power factor display frequency display kWh unit display it can show kW kWh kvarh V...
Page 7: ...ergy kWh L2 22 L2 reverse active energy kWh REV L2 23 L3 total active energy kWh Σ L3 24 L3 forward active energy kWh L3 25 L3 reverse active energy kVarh REV L3 26 Combinatorial reactive total energy kVarh Σ 0 27 Combinatorial reactive energy of tariff1 kVarh Σ T1 28 Combinatorial reactive energy of tariff2 kVarh Σ T2 29 Combinatorial reactive energy of tariff3 kVarh Σ T3 30 Combinatorial reactiv...
Page 8: ...ct Manual Honeywell Smart Energy Elster Kent Metering Pty Ltd 60 Commando Road Industria Ext 2 Johannesburg 2093 South Africa 45 L2 forward reactive energy kVarh L2 46 L2 reverse reactive energy kVarh REV L2 ...
Page 9: ...5 6 System parameters address ...
Page 10: ...23 Read 4 float 01 03 0028 40 L2 reactive power 24 Read 4 float 01 03 002A 42 L3 reactive power 25 Read 4 float 01 03 002C 44 Total Apparent Power 26 Read 4 float 01 03 002E 46 L1 Apparent Power 27 Read 4 float 01 03 0030 48 L2 Apparent Power 28 Read 4 float 01 03 0032 50 L3 Apparent Power 29 Read 4 float 01 03 0034 52 Total Power Factor 30 Read 4 float 01 03 0036 54 Power Factor 31 Read 4 float 0...
Page 11: ...8 T2 Forward Active Energy 66 Read 4 float 01 03 0140 320 T2 Reverse Active Energy 67 Read 4 float 01 03 0142 322 T2 Total Reactive Energy 68 Read 4 float 01 03 0144 324 T2 Forward Reactive Energy 69 Read 4 float 01 03 0146 326 T2 Reverse Reactive Energy 70 Read 4 float 01 03 0148 328 T3 Total Active Energy 71 Read 4 float 01 03 014A 330 T3 Forward Active Energy 72 Read 4 float 01 03 014C 332 T3 R...
Page 12: ...ng to the wiring diagram on terminal box When inserting using copper wire or copper connector will be better 01 03 0330 816 TIME interval 5 87 Read 24 01 03 033C 828 TIME interval 6 88 Read 24 01 03 0348 840 TIME interval 7 89 Read 24 01 03 0354 852 TIME interval 8 90 Read 24 01 03 0360 864 TIME zone 91 Read 24 01 06 0002 2 Meter ID 1 Write 2 01 06 0003 3 Baud Rate 2 Write 2 01 06 0008 8 CT Rate 3...
Page 13: ...lation Push down the clip under the bottom of the meter for a gear see fig 1 and fig 2 Fig 1 Fig 2 Put the meter into the Din rail as per Fig 3 then push up the clip for a gear install meter to the Din rail see Fig 4 Fig 3 Fig 4 Making the connection according to the wiring diagram After connection use lead sealing to seal terminal cover Afterpushdowntheclip ...
Page 14: ...42 33 40 30 1 2 73 6 55 42 50 40 7 1 33 10 80 55 75 55 7 1 76 16 105 80 100 75 7 2 12 25 140 105 130 100 7 2 50 35 170 140 160 125 19 1 83 50 225 170 205 150 19 2 14 75 280 225 255 185 19 2 50 95 340 280 320 240 Note BX BLX copper aluminum core rubber insulated wire or BV BLV copper aluminum core PVC plastic insulated wire widely used in 500V or less than 500V AC and DC power distribution system T...
Page 15: ...y qualified personal Only people that are authorized to install connect and use this equipment and have the proper knowledge about labeling and grounding electrical equipment and circuits and can do so according to safety and regulatory standards are considered qualified personnel in the manual Use for the intend purpose We have checked the contents of this publication and every effort has been ma...
Page 16: ...ering Pty Ltd 60 Commando Road Industria Ext 2 Johannesburg 2093 South Africa In case of failure and or malfunctioning of the device turn off it For any repair only contact technical staff Failure to comply with the above may compromise the device safety ...